Where the issues residents are following stand now. Our coverage of taxes and the 2026 budget begins after the November 3 election.

  • The Fourth Round housing plan is not certified. The state’s non-binding estimate was 565 new affordable homes for 2025–2035; the plan the Planning Board adopted on June 12, 2025 sets the township’s realistic development potential at 223 and claims 300 credits. Fair Share Housing Center and eleven landowners or developers challenged it. In March 2026 the Committee committed to adopt the zoning once the disputes are resolved (R-117-2026) and approved three settlements, whose terms are not public.
  • Route 206 is still being widened. NJDOT’s $42 million project from Doctors Way to Valley Road has been under way since 2021; its fall 2026 target dates from a February 2025 update. The next stage, Valley Road to Brown Avenue, is programmed at $130.918 million.
  • Roads. The $695,616.65 repaving contract began in September 2026, and the Committee approved a chip-surface treatment for Montgomery Road after objections in July.
  • Police plate-reader cameras. The Committee added eight Flock cameras in October 2025; residents raised questions in August and September 2026.

Also dated soon: FEMA’s new flood maps take effect November 13, 2026, and the township’s replacement flood rules, Ordinance 2026-10, have their hearing on November 10.

Entries dated in the future are deadlines or scheduled dates from the record, not predictions. Where sources conflict, the entry says so and cites both.

How to read an entry

  • 25 entries are marked “Key moment.” They carry a heavier rule and a larger headline — the pivots in the story.
  • Status says where a thing stands: milestone, resolved, active, in court, or pending.
  • Sources close every entry. Where an event happened at a catalogued meeting, a “Watch this moment” link opens the township’s video at the exact second.

Jump to: 2028 2026 2025 2024 2023 2022 2021 2020 2019 2018 2009 2007 1942

Filter the timeline

Topic
Status

Showing all 108 entries

2028 1 entries

  1. Open space and environment Pending

    Deadline for the county authority to finish its depot cleanup — link to this entry

    GSA says the Somerset County Improvement Authority must finish cleaning up the Motor Pool Area and Battery Casing Area on the South Parcel by May 6, 2028, a regulatory deadline.

    GSA’s fiscal 2026 prospectus asks Congress for $33,652,000 for the remaining cleanup: groundwater treatment on the North Parcel and at the Motor Pool Area, soil removal at the Battery Casing Area, and 30 years of monitoring. Design and construction are scheduled for FY 2026 to FY 2032. GSA says it must ensure that money is in place before the SCIA proceeds. Whether Congress funded the request is not known.

2026 49 entries

  1. Open space and environment Pending Key moment

    FEMA's revised flood maps take effect — link to this entry

    FEMA's revised Flood Insurance Study and maps for Somerset County, including Hillsborough, take effect. FEMA set the date in a Federal Register notice of August 6, 2026.

    FEMA’s final flood hazard determination for Somerset County, published in the Federal Register on August 6, 2026, established November 13, 2026 as the effective date; the township’s draft Ordinance 2026-10 uses the same date. FEMA’s August 2025 public notice had given only “Fall 2026.” Two Hillsborough map panels change: 34035C0137 and 34035C0141.

  2. Open space and environment Pending

    Public hearing on the flood ordinance — link to this entry

    The Township Committee has scheduled a special meeting at 6:30 pm for the public hearing and final vote on Ordinance 2026-10, three days before FEMA's new maps take effect.

    The meeting is at the Peter J. Biondi Municipal Building, 379 South Branch Road. Residents may comment on the ordinance at the hearing.

  3. Open space and environment Pending Key moment

    New flood ordinance adopting FEMA maps scheduled for introduction — link to this entry

    Ordinance 2026-10, which replaces the township's flood rules and adopts FEMA's new maps dated November 13, 2026, was on the agenda for introduction. A special meeting on November 10 was set for the hearing.

    What it does. The ordinance repeals and replaces Chapter 172, “Flood Damage Prevention,” “To Maintain Compliance And Participation In The National Flood Insurance Program,” which Hillsborough joined on March 2, 1981. It adopts the Somerset County Flood Insurance Study and maps “dated November 13, 2026.” Two panels, 34035C0137F and 34035C0141F, are new. The Township Engineer becomes the Floodplain Administrator. The draft notes that New Jersey’s own flood rules can regulate a wider area than FEMA’s mapped flood zones.

    Where it stands. The October 27 minutes are not yet posted, so the introduction vote is not confirmed. R-335-2026 on the same agenda adds a special Township Committee meeting on November 10, 2026 at 6:30 pm for the hearing.

  4. Roads and utilities Pending

    Virtual public meeting on the Picket Place bridge — link to this entry

    A virtual public meeting on the bridge replacement was announced for October 26, 2026, 6–7 p.m., to give a status update, review the plans, explain the preliminary engineering scope and schedule, and take public feedback.

    As of October 29, 2026 neither the county page nor the project website had posted the presentation or a revised schedule. The project website’s meetings page still listed the public meeting as “Fall 2025”.

  5. Open space and environment Pending

    Planning Board considers support for a flood-resilience transportation planning grant — link to this entry

    The Planning Board agenda included a letter of support for the township's "Green Hills Transportation Resilience & Emergency Access Planning Project," an FY24–FY26 PROTECT planning grant.

    The Board’s minutes for the meeting are not yet posted. The grant amount, scope and outcome were not found.

  6. Affordable housing Pending

    Township attorney: any settlement will be approved at a public meeting — link to this entry

    Responding to public comment, the township attorney said "any settlement agreement will be approved at a public meeting." Affordable housing and warehouse litigation were on the closed-session agenda that night.

    “Affordable Housing” has appeared on the Committee’s closed-session list at most of its meetings since March 2026, including the October 13 and October 27 agendas. No settlement resolution has come to a public vote since March 24.

  7. Township government Active

    Residents raise concerns about Flock cameras — link to this entry

    Two residents raised concerns about the township's Flock license-plate cameras during public comment. The minutes give only one-line summaries.

    The minutes do not record the details of the concerns. The meeting video is on the township’s YouTube channel; the comments come during public comment near the end.

  8. Roads and utilities Resolved

    2026 repaving begins on five streets — link to this entry

    The township announced that the 2026 repaving program began the week of September 7 on Strawberry Lane, Chamberlain Drive, Van Fleet Court, Harman Court and Herder Drive.

    Top Line Construction is milling and repaving the streets. The township said the contractor would tell residents about delays, and that questions can go to the Engineering Department at 908-369-4460.

  9. Roads and utilities Resolved Key moment

    Committee approves $186,392.70 chip-surface treatment for Montgomery Road — link to this entry

    The Committee unanimously approved asphaltic oil and chip surface treatment of Montgomery Road by Asphalt Paving Systems through a state contract, for up to $186,392.70 (R-292-2026).

    The Director of Public Works recommended the work through New Jersey State Contract #24-GNSV2-103435. The resolution says only “Montgomery Road”; it does not identify the section or a schedule, and no completion notice has been found.

  10. Roads and utilities Resolved

    Stone and sand bought for Montgomery Road — link to this entry

    The Committee approved buying crushed stone and sand for Montgomery Road from Tilcon New York through a Morris County cooperative contract, for up to $15,750.

    The purchase was requested by the Director of Public Works. It was part of the consent agenda.

  11. Land use and development Pending

    Township: first master plan elements may come before the end of 2026 — link to this entry

    In written answers to residents' questions, the township said the Goals and Objectives, Land Use Element, and Housing Element and Fair Share Plan "may be considered before the end of 2026", with other elements in 2027.

    The answers are attached to the minutes. As of October 29, 2026 no draft element had been posted or placed on a Planning Board agenda through December 10.

  12. Township government Active

    $82,000 Flock payment on the bill list; a resident asks about it — link to this entry

    The August 25 bill list included an $82,000 payment to Flock Safety under the 2024 contract (R-238-2024): $60,000 for plate readers, $11,500 for three-year data retention and $10,500 for a movable "Flex" camera. A resident asked about the line item.

    The lines read “Flock Safety LPR, fka Falcon 60,000.00”, “Extended Data Retention (NJ 3 Years) 11,500.00” and “Flock Safety LPR Flex, fka Falcon Flex 10,500.00”. The bill list does not say what period the payment covers or how many cameras it pays for. The minutes record the resident’s question but no answer.

  13. Open space and environment Resolved

    Engineering reminders on sump pumps and private stormwater systems — link to this entry

    The township reminded residents that sump-pump lines causing hazardous street flooding or icing must be relocated, and that businesses and HOAs must maintain private stormwater systems and file an annual certification.

    Older lines that discharge to gutters are grandfathered, and new construction may not discharge to the street. The reminders were also given in the Committee’s August 25 reports.

  14. Roads and utilities Resolved

    Route 206 pedestrian bridge reopens — link to this entry

    The replaced sidewalk bridge over Royce Brook reopened with a ribbon cutting, reported at the July 28 Township Committee meeting. The contractor's bonds were settled on September 22, 2026 (R-295-2026).

    The bridge had been closed since February 2025. Fabrication began in February 2026. Final curb ramps and crosswalks at Beekman Lane, Auten Road, Raider Boulevard and the post office were to wait for the new traffic signal work. On September 22, 2026 the Committee released the contractor’s performance bond and accepted its maintenance bond, closing out the job.

  15. Roads and utilities Resolved

    Resident and Sourland Conservancy object to chip-sealing Montgomery Road — link to this entry

    In public comment, a Montgomery Road resident spoke against the chip sealing program, citing safety and flooding, and the Sourland Conservancy's executive director spoke against the chip seal project.

    The minutes summarize each comment in one line. The full remarks are in the meeting video. No Committee action on Montgomery Road was taken that night.

  16. Roads and utilities Resolved

    Flemming Drive Phase 2 sidewalks awarded for $253,070 — link to this entry

    On rebid, the Committee unanimously awarded Flemming Drive Phase 2 sidewalk replacement to Cedar Contracting for $253,070, the lowest of seven bids (R-232-2026).

    The only bid in the first round was rejected in November 2025 as over the township’s estimate. A completion date is not on record.

  17. Township government Resolved

    Police join Arrive Together crisis-response program — link to this entry

    The Committee unanimously ratified a memorandum of understanding with Bridgeway Behavioral Health Services to join the ARRIVE Together pilot, in which mental-health specialists assist police on certain behavioral-health crisis calls (R-230-2026).

    ARRIVE stands for “Alternative Responses Reduce Instances of Violence and Escalation.” The resolution says Bridgeway already takes part with other Somerset County police departments. It passed as part of a 27-item consent agenda, which also included furniture for the police department expansion.

  18. Roads and utilities Resolved Key moment

    Committee awards the 2026 repaving contract for $695,616.65 — link to this entry

    The Committee unanimously awarded the 2026 Capital Roadway Paving contract to Top Line Construction for $695,616.65, the lowest of five bids (R-234-2026), on its consent agenda.

    Work began the week of September 7 on Strawberry Lane, Chamberlain Drive, Van Fleet Court, Harman Court and Herder Drive.

  19. Land use and development Resolved Key moment

    Sunnymead Landfill Redevelopment Plan adopted — link to this entry

    Ordinance 2026-07 was on the Committee's agenda for second reading and a public hearing, and the township's master plan page lists the Sunnymead Landfill Redevelopment Plan as adopted on June 23, 2026.

    The minutes of the meeting had not been posted as of October 29, 2026, so the vote is not yet in the public record. The adopted plan, posted on the township’s master plan page and marked “Adopted: June 23, 2026 (Ordinance 2026-07)”, lists permitted uses including solar energy systems, Class B recycling, offices, self-storage, small-scale storage and distribution, enclosed manufacturing, contractor facilities and recreation.

  20. Open space and environment Pending

    Fox Chase Pond shoreline restoration contract on the agenda — link to this entry

    The agenda carried R-210-2026, a contract of up to $41,600 with West Jersey Lawn Care for excavation for the Fox Chase Pond Shoreline Restoration Project, with the Rutgers Cooperative Extension Water Resources Program.

    On May 12, 2026 a resident told the Committee that NJDEP funds for the pond’s restoration “have to be used by December 31, 2026.” The June 23 minutes were approved in August but have not been posted, so the vote on R-210-2026 is not confirmed. The grant’s name and amount are not on record.

  21. Land use and development Resolved

    Planning Board finds the Sunnymead plan consistent with the master plan, 7–0 — link to this entry

    The Planning Board found the Sunnymead Landfill Redevelopment Plan consistent with the master plan and recommended adoption, 7–0. No member of the public commented.

    The township planner described the plan as “a hybrid of one of our industrial districts” and said that once adopted it “becomes the zoning for the area”, allowing the owner to apply for a site plan.

  22. Roads and utilities Pending

    Township applies for a state grant to finish Bloomingdale Drive — link to this entry

    The Committee approved an application for an NJDOT fiscal 2027 Municipal Aid grant for Bloomingdale Drive (R-186-2026), as part of a unanimously approved consent agenda.

    Part of Bloomingdale Drive was paved in 2025. NJDOT announced its previous two rounds of Municipal Aid awards in mid-November (November 14, 2024 and November 17, 2025).

  23. Roads and utilities Active

    Northbound Route 206 ramp to Falcon and Triangle Roads closes — link to this entry

    The northbound ramp to Falcon Road and Triangle Road closed, with a detour via Opie Road. NJDOT expects the pattern to stay in place through late fall 2026.

    WRNJ, relaying NJDOT, reported the traffic pattern is expected “to remain in place through late fall 2026.” NJDOT also said the new median barrier “will eliminate left turns to and from properties” along the widened road.

  24. Land use and development Resolved

    Sunnymead Landfill Redevelopment Plan introduced as Ordinance 2026-07 — link to this entry

    The Committee introduced Ordinance 2026-07, adopting the Sunnymead Landfill Redevelopment Plan for Lots 6 and 7.02 and creating a Sunnymead Landfill Redevelopment District. The introduction was unanimous.

    The hearing was set for June 23, 2026, and the ordinance was referred to the Planning Board for a consistency review.

  25. Land use and development Resolved

    Interactive public workshop on the master plan — link to this entry

    The township held an interactive Envision Hillsborough workshop for residents and board members, announced at the Planning Board on April 16 and May 7.

    The township later said it had “held two public engagement events”. No summary of the workshop has been published that LocalWhy has found.

  26. Land use and development Resolved

    Zoning Board approves Chick-fil-A at Route 206 and Triangle Road, 5–2 — link to this entry

    The Zoning Board of Adjustment approved a 5,400-square-foot Chick-fil-A with two drive-through lanes at 296 Route 206, 5–2. It cannot get a certificate of occupancy until NJDOT's Route 206 and Triangle Road improvements are finished.

    The site is an Exxon station in the OLC zone, where drive-throughs are not permitted, so the application needed a use variance, along with four bulk variances and nine waivers. The applicant accepted the board planner’s 14 conditions. The key one ties the opening to the state road work: no certificate of occupancy until the Route 206 and Triangle Road improvements are completed to the satisfaction of NJDOT and the board engineer. Hearings ran from February to May 2026. The resolution was memorialized on September 2, 2026. Zoning Board meetings are not video-recorded.

  27. Open space and environment Resolved Key moment

    State gives final approval to preserve 438.81 acres of the Mindel tract — link to this entry

    The State Agriculture Development Committee unanimously granted final approval (Resolution FY2026R4(16)) to buy the development easement on 438.81 acres of the Mindel tract. One member recused.

    The approval lists “Township of Hillsborough (Mindel), SADC ID#18-0038-DE, FY2026R4(16), Block 198, Lot 2; Block 198.01, Lot 1; Block 198.02, Lot 1.01; Block 199.02, Lot 1 … 438.81 acres.”

    No record of the closing, the payment or a recorded deed of easement has been found since.

  28. Land use and development Resolved

    Master plan survey on open space and recreation opens — link to this entry

    The township opened its third Envision Hillsborough survey, on open space and recreation. Earlier surveys covered goals and land use. It closed on May 17, 2026.

    LocalWhy has not found published results from any of the three surveys.

  29. Township government Pending

    State law limits how police may share license-plate data — link to this entry

    P.L.2026, c.4, the Privacy Protection Act, limits sharing of plate-reader data and requires out- of-state police to certify they will not use it for civil immigration enforcement. Agencies must post updated policies within a year.

    The law allows sharing only with other government entities “when permitted by law,” under a court order or warrant, with consent, or with out-of-state police for a criminal investigation after they certify the required conditions. Sharing agreements are public records. It does not change the three-year retention period set by the Attorney General.

  30. Land use and development Resolved Key moment

    Committee expands the Sunnymead redevelopment area; no eminent domain — link to this entry

    The Committee designated Lot 6 a non-condemnation area in need of redevelopment, added it to the Sunnymead Landfill Redevelopment Area and directed the planning director to prepare a redevelopment plan. The township attorney said the owner wanted more acreage "to make the solar project financially feasible".

    “Non-condemnation” means the township cannot use eminent domain to acquire the property. The resolution passed on a consent agenda recorded as unanimously approved.

  31. Open space and environment Resolved Key moment

    Committee adopts the Mindel tract easement sale at $30,600 an acre — link to this entry

    Ordinance 2026-03 was adopted on a roll call with no dissent recorded. It sells the development rights on about 440 acres to the State Agriculture Development Committee at $30,600 an acre, subject to the final survey.

    The price. The state’s formula price is $27,200 an acre. The township accepted two optional restrictions, each worth $1,700 an acre more: impervious cover limited to 10%, and any house limited to 2,500 square feet. That makes $30,600 an acre. The final amount depends on surveyed acreage and title.

    What it means. The township attorney told the meeting that the land “is preserved farmland and not open space.” The Township Planner said the SADC might work with the county on a possible trail, and that “About 420 acres will be preserved.”

  32. Affordable housing Resolved

    Settlements approved with two challengers; Valley Road Realty settlement amended — link to this entry

    The Committee approved settlements with Murray Contracting and Homestead Corner (279 Homestead Road) and with Robertson Douglas Group (Mountainview Road), and a first amendment to the 2020 Valley Road Realty settlement. The agreements' terms have not been published.

    All three passed on a consent agenda the minutes record as unanimously approved.

    • R-131-2026, Murray Contracting and Homestead Corner, LLC: 279 Homestead Road near Route 206 (Block 200.02, part of Lot 12, and Lots 12.01 and 16). Murray withdraws its challenge with prejudice.
    • Robertson Douglas Group, Inc.: Mountainview Road (Block 175, Lots 25 and 41).
    • Valley Road Realty, LLC: a Third Round site of 44.53 acres on Valley Road (Block 151.09, Lot 227). The amendment reduces the market-rate units and changes their type “while maintaining the affordable housing obligation on the Property as previously agreed upon”.

    Each agreement was “annexed” to its resolution, but none is in the minutes or the court’s posted filings.

  33. Open space and environment Resolved

    Ordinance to sell the Mindel development easement introduced — link to this entry

    The Committee unanimously introduced Ordinance 2026-03, selling a farmland preservation easement on the Mindel tract to the State Agriculture Development Committee, and set the hearing for March 24.

    The township announced the ordinance on March 16 and opened online comment on Engage Hillsborough. It said it expected “approximately $13.1 million” for the development rights.

  34. Affordable housing In court Key moment

    Committee commits to adopt the housing zoning after the disputes end — link to this entry

    Resolution R-117-2026 commits the township to adopt the ordinances and resolutions that carry out its housing plan "following the resolution of the disputes", adjusted to reflect their outcome. It passed on a unanimous consent agenda and was filed with the court the next day.

    This is the alternative the amended Fair Housing Act offers to towns still in a dispute when the March 16, 2026 deadline for implementing ordinances arrives, and the one Judge Mennen’s January 27 order allowed. The resolution recites the twelve challengers, the settlement conferences and the Program member’s recommendation.

    No Fourth Round rezoning ordinance has been introduced since.

  35. Land use and development Resolved

    Solar sublease deadlines extended after the lawsuit delay — link to this entry

    The Committee unanimously approved a second amendment to the Belle Mead Depot Solar sublease and easement agreement, extending certain timeframes because of the delay caused by the litigation (R-118-2026).

    The resolution says it was “necessary to further amend the Sublease … to extend certain timeframes and make other modifications due to the delay in the Project associated with litigation involving the Property.” The township administrator said the payments were being extended “because the solar field is taking longer to build.”

  36. Open space and environment Resolved

    Grant application for a Willow Road green infrastructure study — link to this entry

    The Committee supported an application for a $2,000 Sustainable Jersey/PSEG grant for a Willow Road Green Infrastructure Feasibility Study (R-98-2026), as part of a unanimously approved consent agenda.

    Whether the grant was awarded is not on record.

  37. Litigation Resolved Key moment

    Committee approves settlement of the depot lawsuit — link to this entry

    The Committee approved a settlement in the Volkert case (R-99-2026) as one of the consent items (1–3 and 5–14) approved unanimously. The township attorney said Hillsborough and the SCIA each pay $50,000 and the solar company pays $150,000 to the plaintiff.

    The resolution authorizes the mayor and clerk to sign a “Settlement Agreement and General Release” in Donald J. Volkert, as Special Fiscal Agent on behalf of Hillsborough Properties, LLC v. Somerset County Improvement Authority, Township of Hillsborough and County of Somerset, Docket No. SOM-L-001705-24. The payment split comes from the township attorney’s explanation at the meeting. The settlement agreement itself was not posted.

  38. Township government Resolved

    Committee buys two police drones and awards a $593,000 station renovation — link to this entry

    On its consent agenda, the Committee unanimously approved two police drones for up to $24,999.91 (R-94-2026) and awarded BGD Contracting up to $593,000 for renovations to the police department (R-100-2026), the lowest bid.

    The minutes record that the drones were paid for with a $5,000 grant and a $20,000 donation. The next two lowest renovation bids were $594,000 and $616,000. Network cabling ($28,857.50, April 2026) and furniture ($28,137.60, July 2026) for the police “expansion” followed.

  39. Land use and development Resolved Key moment

    Ordinance 2026-01 allows small-scale storage of up to 25,000 sq ft per building — link to this entry

    Carrying out the Hillsborough Industrial settlement, the Committee adopted Ordinance 2026-01 after a public hearing. It permits "small scale storage and distribution" and enclosed manufacturing in the I-1, I-2 and I-3 districts, with no more than one loading dock per 5,000 sq ft.

    The ordinance was introduced unanimously on January 27 and found consistent with the master plan by the Planning Board on February 5. It defines the new use as no more than 25,000 sq ft of floor area per building, with “low daily trip generation, infrequent truck traffic”, and bars trailer parking except at the loading dock.

    At the hearing the township planner said the ordinance “does not permit data centers in these zones” and limits an existing user’s ability to substantially change its size or use.

  40. Litigation Resolved

    Adoni Property Group withdraws its challenge — link to this entry

    Adoni Property Group LLC withdrew its objection to the township's housing plan with the court.

    Resolution R-117-2026 records the withdrawal. It leaves eleven challengers, two of which (Murray and Robertson Douglas) had already reached settlements in principle.

  41. Land use and development Resolved

    Planning Board adopts its written Lot 6 recommendation, 7–0 — link to this entry

    The Planning Board adopted, 7–0, the written resolution of recommendation memorializing its January 22 vote to recommend that Lot 6 be designated and added to the Sunnymead redevelopment area.

    The January 22 vote was 9–0; the written resolution passed with seven votes. The Committee’s March 24, 2026 designation resolution recites the February 5 resolution.

  42. Roads and utilities Resolved

    Pennoni hired to design Farm Road improvements — link to this entry

    As part of a unanimously approved consent agenda, the Committee hired Pennoni to prepare the Farm Road plans and specifications NJDOT requires for the grant, for up to $40,300 (R-37-2026).

    The work covers Farm Road between Route 206 and Triangle Road. No construction date is on record.

  43. Litigation In court

    Judge orders: adopt the zoning by March 16, or commit to it by binding resolution — link to this entry

    Judge Mennen ordered the township, by March 16, 2026, either to adopt its amended plan and implementing ordinances or to adopt a binding resolution committing to adopt them once the disputes are resolved.

    The order, quoted in Resolution R-117-2026, follows the procedure in the amended Fair Housing Act for towns “involved in a continuing dispute”. Any ordinances adopted under the first option would be “subject to change based on any forthcoming settlement”.

  44. Land use and development Resolved

    Planning Board recommends adding Lot 6 to the Sunnymead redevelopment area, 9–0 — link to this entry

    After a public hearing on the amended preliminary investigation report, the Planning Board voted 9–0 to recommend that the Committee designate Block 182, Lot 6 a non-condemnation area in need of redevelopment.

    The township planner told the Board the hearing was limited to the statutory findings: it was not approving a development, choosing a developer, changing zoning or authorizing eminent domain. He said Lot 6 is zoned RA (residential) and the landfill lot I-1 light industrial, and that adding Lot 6 gives the owner the chance to use as much of the property as possible while it fully closes the landfill, which he confirmed still needs to be cleaned up.

    The Committee later found that the testimony showed the lot had been “vacant and underutilized for more than fifty (50) years”, meeting criterion “e” of the state law, which covers land that is not being properly used and is stagnant or unproductive. The Board adopted its written resolution on February 5.

  45. Land use and development Resolved

    303 Amwell Road warehouse application withdrawn — link to this entry

    The 80,000 sq ft industrial building proposed at 303 Amwell Road was withdrawn. The township planner told the Planning Board the township attorney had informed them the property had been acquired, "deed in hand".

    In December 2025 the Board attorney had said the township was “in the process of attempting to acquire” the site. The township had agreed in 2023 to buy 303 Amwell Road and 1170 Millstone River Road as open space to stop warehouse applications. According to the January 22 minutes, the prior owner asked for the return of its escrow funds; the Committee released the 303 Amwell, LLC development review escrow on March 10, 2026.

  46. Land use and development Resolved

    Planning Board reappoints its master plan subcommittee — link to this entry

    At its reorganization meeting the Planning Board reappointed a three-member master plan subcommittee, with an alternate, to work on the update.

    The Board had a master plan subcommittee in 2025 as well.

  47. Roads and utilities Pending

    Regional plan programs $130.918 million for Route 206, Valley Road to Brown Avenue — link to this entry

    The NJTPA Transportation Improvement Program lists the next Route 206 section at $130.918 million, with design money in 2026 and construction money in 2027–2029. It also lists a $34.5 million replacement of the Hamilton Road railroad bridge.

    Project DB 780A would widen Route 206 from two lanes to four, add two jughandles and replace “the railroad bridge over Route 206.” Programmed: $6.0 million design in FY2026; construction of $3.0 million (FY2027), $50.0 million (FY2028) and $46.0 million (FY2029), plus $21.5 million in 2030–2035.

    Project DB 14416 would replace the 1918 Hamilton Road bridge over the railroad, raising it and adding a north-side sidewalk. Design and right-of-way money are programmed for FY2026; its $25.9 million construction money is in 2030–2035.

  48. Roads and utilities Pending

    Regional plan lists the Picket Place bridge at $18.616 million, with construction in 2030–2035 — link to this entry

    The NJTPA Transportation Improvement Program lists the county bridge replacement (DB N1807) at an estimated $18.616 million: $1.9 million for design in FY2027, $50,000 for right-of-way in FY2028 and $15.8 million for construction in 2030–2035.

    The construction money sits in the program’s “unconstrained” years, beyond the four years it funds. The project website says the construction cost “is yet to be determined”; MyCentralJersey cited a 2021 estimate of $15.4 million.

2025 30 entries

  1. Litigation In court Key moment

    Program member recommends: plan "not presently in compliance" — link to this entry

    After three settlement conferences and oral argument from the remaining challengers, the Dispute Resolution Program member recommended that the court find the plan not presently in compliance, extend the township's immunity "for a few more months" and oversee further negotiations.

    Settlement conferences on October 21, November 24 and December 9, 2025 produced settlements with Murray and Robertson Douglas “by including projects on their respective properties” in the plan, but not with the other challengers. On December 22 the Program member heard their oral argument.

    According to Resolution R-117-2026, the Program member recommended to Judge William Mennen a finding that the plan “is not presently in compliance with the FHA and the Mount Laurel doctrine”. The member also found that the township had “demonstrated [a] willingness to engage in negotiations” and recommended that “immunity from exclusionary housing litigation should be extended to the Township for a few more months” while the court directs continued settlement talks. The written recommendation is not posted.

  2. Roads and utilities Resolved

    Ida-damaged Harvard Way basin rebuilt — link to this entry

    The Committee was told that the detention basin at Harvard Way and the Hillsborough Campus, severely damaged by Ida, had been reconstructed to its original design.

    The rebuild waited two years for an NJDEP permit, and work could not start until October 2025 because of bat-habitat restrictions, the Committee was told in June 2025.

  3. Roads and utilities Resolved

    State awards $505,903 for Farm Road — link to this entry

    The township announced an NJDOT fiscal 2026 Municipal Aid grant of $505,903 for Farm Road improvements, including ADA curb ramps at intersections and enhanced crosswalks.

    The minutes say “the scope of work will include upgrading sidewalk ramps at intersections to meet the latest ADA handicap standards and installing enhanced crosswalks.” NJDOT announced $150 million in fiscal 2026 Municipal Aid statewide on November 17, 2025. Under the program NJDOT pays 75% of a grant when the town awards a contract and the rest when the project is complete.

  4. Land use and development Resolved

    On remand, Planning Board reaffirms the Harvard Way denial 5–0 — link to this entry

    After rehearing the stormwater issues the court sent back, the Planning Board voted 5–0 to affirm its 2022 denial of the Harvard Way warehouse. It adopted the written resolution on February 5, 2026.

    The minutes record reasons including soil classification and infiltration testing, the lack of a witness to testify on the state environmental permits, and the unknown tenant. Whether the developer returned to court afterwards is not in the public record.

  5. Litigation In court Key moment

    Homestead Road LLC sues over the warehouse denial — link to this entry

    Homestead Road LLC filed suit in Somerset County Superior Court asking the court to overturn the Planning Board's denial and approve its application, according to Patch.

    The docket number is not public. A residents’ group announced that a motion by several groups to join the case was scheduled for oral argument on March 31, 2026; LocalWhy has not found the outcome. The case was pending as last reported.

  6. Roads and utilities Resolved

    Committee awards $273,000 contract to replace the Route 206 pedestrian bridge — link to this entry

    The Township Committee unanimously awarded Capela Construction $273,000 to replace the sidewalk bridge over Royce Brook (R-312-2025), as part of its consent agenda.

    The resolution calls it the “Pennington Properties Pedestrian Bridge Replacement.” At the same meeting the township reported that the state had finished all stormwater detention basins and their fences on the Route 206 job.

  7. Litigation Resolved

    Committee settles the Hillsborough Industrial suit — link to this entry

    The Committee authorized a settlement of SOM-L-0070-25 under which the township would adopt an ordinance permitting small-scale storage and distribution and enclosed manufacturing, in return for dismissal of the suit.

    The resolution, R-321-2025, passed on a 39-item consent agenda recorded as unanimously approved. Ordinance 2026-01 records that the parties signed the settlement on December 5, 2025.

  8. Roads and utilities Resolved

    Flemming Drive sidewalk bid rejected as too high — link to this entry

    The Committee rejected the only bid for Flemming Drive Phase II sidewalk replacement, from Cedar Contracting, because it substantially exceeded the cost estimate, and ordered a rebid (R-306-2025).

    The resolution says the bid, opened October 1, 2025, “substantially exceeds the Township’s cost estimate and appropriations budgeted for the project.” The same minutes record that Asphalt Paving Systems had finished “over seven miles of pavement preservation work” in 2025, and that the township would apply for a state grant to finish Bloomingdale Drive.

  9. Open space and environment Resolved

    Committee approves a 120-day option for the state to buy the Mindel easement — link to this entry

    As part of a consent agenda approved unanimously, the Committee authorized a 120-day option agreement with the State Agriculture Development Committee for farmland preservation of the township-owned Mindel property.

    The resolution was titled “120-Day Option Agreement with the State Agriculture Development Committee for Potential Farmland Preservation of the Township Owned Mindel Property.” Consent items 1 through 17 passed unanimously. The resolution lists the acreage of each parcel.

  10. Township government Resolved Key moment

    Committee buys eight more Flock license-plate cameras for $28,000 — link to this entry

    The Township Committee authorized the purchase of eight more Flock Safety license-plate reader cameras "with extended data retention" for $28,000. It passed unanimously as part of the consent agenda.

    The resolution says “the Township currently utilizes the system and is in need of additional units,” and calls Flock “the sole manufacturer, developer and distributor” of the camera, the basis for buying without bids. The money came from the 2025 police budget. A later bill list cites the resolution as R-286-2025. The resolution does not say how many cameras the township had before, or where the new ones would go.

  11. Roads and utilities Resolved

    2025 paving mostly done; Montgomery Road chip-sealed — link to this entry

    The township reported the 2025 paving program mostly complete, with NJDOT grants of $438,435 for Auten Road and $356,411 for Dukes Parkway West. A Committee report thanked Public Works for the chip seal on Montgomery Road.

    Repaved in 2025: Kilmer Drive, Beverly Drive, Fern Way, Gail Court, Briar Way, Scott Drive, Barbara Drive, Arlene Court, Matthew Road, Daniel Drive, Walnut Grove Road, Falcon Crest Lane, the rest of Falcon Road, Township Line Road and Auten Road between the railroad and Triangle Road.

    Grants. The Auten Road and Dukes Parkway West grants paid for more than half the cost of repaving those roads. The Brown Avenue project was reported complete, “fully funded” by “$1.9 million in grant money.”

  12. Land use and development Resolved Key moment

    Planning Board denies the Homestead Road warehouses — link to this entry

    After about three years of hearings, the Planning Board unanimously denied Homestead Road LLC's 543,299 sq ft plan: two warehouses of 168,304 and 368,995 sq ft and a 6,000 sq ft office. It adopted the written resolution 5–0 on October 9, 2025.

    Reasons reported include building height, traffic, noise, stormwater and truck routes onto Route 206. One Patch report gives the date as September 3.

    The same property is listed in the township’s June 2025 affordable-housing plan as an inclusionary site for 398 townhouses and stacked flats, 96 of them affordable. The plan gives the address as 189 and 200 Homestead Road; residents give 189 and 203.

  13. Litigation In court

    Twelve parties challenge the township's housing plan — link to this entry

    Fair Share Housing Center and eleven landowners and developers filed challenges to the plan. Murray Contracting filed on August 28 and Robertson Douglas Group on August 29.

    Resolution R-117-2026 lists the challengers: Fair Share Housing Center; 00 Hamilton LLC; Adoni Property Group LLC; AvalonBay Communities Inc.; Fairhaven Development LLC; Hillsborough RB LLC; M&M Realty Partners LLC; Murray Contracting and Homestead Corner LLC; Robertson Douglas Group Inc.; Valley Industrial Partners LLC; West Essex Industrial Park LLC; and Weston Road LLC. The disputes were referred to the Dispute Resolution Program.

  14. Open space and environment Resolved

    FEMA opens the 90-day appeal period on the new flood maps — link to this entry

    The 90-day period to appeal or comment on FEMA's revised preliminary flood maps for Hillsborough opened.

    FEMA’s notice invited property owners to review the revised preliminary maps for Hillsborough, Bedminster, Branchburg and Union Township before they become final.

  15. Open space and environment Resolved Key moment

    Committee adopts a long-range drainage plan and hires Pennoni for the watershed inventory — link to this entry

    The Committee adopted a resolution creating a long-range plan to address drainage problems and hired Pennoni, for up to $134,000, for the Watershed Inventory Report the state requires.

    The plan. The resolution, “Creating and Implementing a Long-Range Plan to Address Drainage Issues,” cites “scarce resource immunity” (N.J.S.A. 59:2-3). It directs a Watershed Assessment and a Watershed Improvement Plan listing projects, a schedule, costs and funding sources, to be updated every two years.

    The inventory. Pennoni’s contract covers the Watershed Inventory Report, Phase I, “as part of the NJDEP requirements,” plus mapping of the township’s storm sewer system. No report has been posted.

  16. Land use and development Resolved

    First amendment to the depot solar sublease — link to this entry

    The Committee approved a first amendment to the Belle Mead Depot Solar sublease, adding a metes- and-bounds description of the leased area and other changes to accommodate the project (R-224-2025).

    The amendment is described in the recitals of the March 10, 2026 second amendment.

  17. Litigation Resolved

    Housing plan filed with the court and the Dispute Resolution Program — link to this entry

    The township filed its adopted plan with the court and the Affordable Housing Dispute Resolution Program, within the deadline. The Township Committee had approved a resolution accepting the plan on June 24.

    The amended Fair Housing Act required towns to file their plans within 48 hours of adoption or by June 30, 2025. Resolution R-117-2026 records that Hillsborough filed on June 25, 2025, “in accordance with the requirements of the Amended FHA”. Patch reported that the Committee approved a resolution accepting the plan on June 24; it gave no vote tally.

  18. Roads and utilities Resolved

    Montgomery Road: full paving put at $1.5 million, chip seal at $100,000 — link to this entry

    Residents asked the township to pave Montgomery Road's unpaved stretch. The mayor at the time said full paving would cost about $1.5 million and chip seal about $100,000. The township also asked the state for aid to improve Farm Road.

    On May 27, 2025 a Montgomery Road resident asked that paving the unpaved section be made a priority. On June 24 residents described dust and ditches “2-3 feet deep.” The minutes record the mayor at the time as saying that “full paving would cost approximately $1.5 million while the chip-seal preservation process would be approximately $100,000.”

    The same night the township reported that it had submitted a local-aid request to improve Farm Road from Route 206 to Triangle Road.

  19. Open space and environment Resolved

    Township joins the state Blue Acres buyout program and adopts the county hazard plan — link to this entry

    The Committee approved an agreement with NJDEP Blue Acres under which the township maintains the lots of flood-damaged homes the state buys, and adopted the 2025 Somerset County Hazard Mitigation Plan. The Committee was told 11 owners had applied.

    Under Blue Acres, the state buys flood-prone homes from owners who want to sell and demolishes them. The Committee was told the houses are demolished within 90 days and the lots turned to grass, and that FEMA and Blue Acres were looking at homes in the floodplain along Dukes Parkway East and Kimberly Road. The same night’s stormwater report said the Harvard Way basin rebuild had its NJDEP permit after two years but could not start until October 2025 because of bat-habitat restrictions. How many purchases have closed is not on record.

  20. Affordable housing Resolved Key moment

    Planning Board adopts the Fourth Round housing plan: 223 realistic, 300 credits — link to this entry

    The Planning Board adopted the Housing Plan Element and Fair Share Plan. It starts from the state's 565, applies land-capacity adjustments that set a realistic development potential of 223, and claims 300 credits, leaving an unmet need of 342.

    The plan, prepared by Leon S. Avakian, Inc., applies a vacant land adjustment to land in the sewer service area, mostly in the east, and a durational adjustment to land on septic systems, mostly in the west. The result is a realistic development potential of 223, with the rest of the 565, 342, carried as unmet need.

    It claims 300 credits: 57 from existing developments and group homes, 15 from extending expiring controls at Hillsborough Point, 222 from three inclusionary sites (Homestead Road, LLC, Milelli Hillsborough on Route 206 and Falcon Road Partners) and 6 from Habitat for Humanity. That is a surplus of 77. The Board’s resolution records the vote as 9-0, with two members absent.

  21. Litigation Resolved

    A court order on Hillsborough's obligations, not made public — link to this entry

    A March 2026 township resolution refers to an April 23, 2025 court order establishing Hillsborough's fair share obligations. The order is not posted, and LocalWhy has not seen what number it set.

    The township’s March 24, 2026 settlement resolution with Robertson Douglas Group says the June 2025 plan “was designed to meet the fair share obligations established by the aforesaid April 23, 2025 Order”. The order itself is not among the filings posted on the court’s Somerset affordable-housing page.

    The June 2025 plan lists the prospective need as 565 before adjustments, not the 270 the Committee had committed to. Whether the order accepted 270, 565 or another number is not in the public record.

  22. Open space and environment Resolved

    Committee told the revised map changes the River Road area near Studdiford bridge — link to this entry

    The Committee was told the township had received a preliminary revised FEMA map for panel 137, covering parts of River Road by the Studdiford bridge, with a minor revised flood area due to Ida. Comments were due April 7.

    The report described a minor revised flood area due to Tropical Storm Ida. Panel 137 is one of the two panels that get new maps under the township’s draft Ordinance 2026-10.

  23. Open space and environment Resolved

    FEMA releases revised preliminary flood maps for Hillsborough — link to this entry

    FEMA released revised preliminary Flood Insurance Rate Maps for Hillsborough, Bedminster, Branchburg and Union Township in Hunterdon County.

    FEMA’s August 2025 notice lists Hillsborough among four communities with revised preliminary maps released on March 7, 2025, and gives the expected effective date as “Fall 2026,” subject to change.

  24. Roads and utilities Pending

    NJDOT's last project update sets a fall 2026 finish for the widening — link to this entry

    NJDOT updated its Route 206 project page with "Scheduled Completion: Fall 2026" and a staged schedule ending with the median barrier and final paving, to start in spring 2026. The page has not been updated since.

    The page’s milestone table had Stage 1 (northbound widening) finishing in fall 2025, Stage 2 (southbound widening) starting in fall 2025, and Stage 3 (median barrier and final paving) starting in spring 2026. As of October 29, 2026 the page still carried the February 27, 2025 date, so it is the most recent official NJDOT schedule.

  25. Land use and development Resolved

    Ordinance amended to allow small-scale logistics in the LI district — link to this entry

    To settle the Larken suit, the Committee adopted an amendment permitting small-scale logistics in the LI district, limited to 41,000 sq ft and 35 feet in height, according to Patch.

    Patch reported the vote as unanimous. The amending ordinance’s number was not reported.

  26. Roads and utilities Pending

    Township closes the Route 206 pedestrian bridge over Royce Brook — link to this entry

    The township-owned sidewalk bridge along Route 206 over Royce Brook, between Raider Boulevard and Amwell Road, was found to have "corroded steel" and was closed to pedestrians.

    This bridge is a township project, separate from NJDOT’s widening. In April 2025 the township expected the replacement to be done in fall 2025; it reopened in July 2026.

  27. Litigation Resolved

    Judge sends Harvard Way back to the Planning Board — link to this entry

    Judge William G. Mennen remanded the Harvard Way warehouse case to the Planning Board on limited issues, principally stormwater, rather than overturning the denial.

    Patch reported that the court asked the Board to explain why it credited the objectors’ stormwater engineer over the applicant’s.

  28. Affordable housing Resolved Key moment

    Committee commits to 270 units instead of 565 and goes to court — link to this entry

    Resolution R-51-2025 accepted a present need of 111 and committed to a prospective need of 270, not the state's 565, after the township's planner found the state's land data "overinclusive". The township filed its court case, SOM-L-148-25, the next day.

    The resolution says the township reviewed the parcels the DCA counted as developable and found that “a number of the lands identified by the DCA are not developable”. It commits to a prospective need of 270, “subject to any vacant land, durational and/or other adjustments” in the plan to come, and reserves the right to lower the present need of 111 through a windshield survey. Patch reported that it passed unanimously.

    The resolution directed the township’s housing counsel to file a declaratory judgment action within 48 hours. The complaint, In the Matter of the Application of the Township of Hillsborough, was filed on January 29, 2025, docket SOM-L-148-25.

  29. Land use and development Resolved

    Master plan amended for small-scale logistics in the Light Industrial district — link to this entry

    The Planning Board adopted a land use element amendment, "Light Industrial District Small Scale Logistics Facilities", the planning basis for the Larken settlement.

    The township lists the amendment among its master plan documents. It is the most recent land use amendment before the Envision Hillsborough update.

  30. Litigation In court

    Hillsborough Industrial sues to overturn the warehouse ordinance — link to this entry

    Hillsborough Industrial, LLC, which owns developed properties in the I-2 district, sued to invalidate Ordinance 2023-08 (docket SOM-L-0070-25).

    Patch reported the suit on January 24, 2025 as filed “last week”. The docket number comes from the township’s November 2025 settlement resolution.

2024 8 entries

  1. Affordable housing Resolved

    State estimates Hillsborough's Fourth Round obligation: 565 new affordable homes — link to this entry

    The Department of Community Affairs estimated Hillsborough's 2025–2035 obligations at a present need of 111 and a prospective need of 565. The law calls these estimates non-binding.

    The 2024 amendments to the Fair Housing Act required the DCA to publish non-binding estimates of every town’s Fourth Round obligations by October 20, 2024. Its October 18 report put Hillsborough’s present need (rehabilitating substandard homes occupied by lower-income households) at 111 and its prospective need (new affordable homes for 2025–2035) at 565.

    Towns could accept the estimates or make their own determination. The figures are recited in Hillsborough’s Resolution R-51-2025.

  2. Roads and utilities Pending

    Preliminary engineering begins on the Picket Place bridge — link to this entry

    Somerset County began the preliminary engineering phase of the bridge replacement. The project website says it runs "Fall 2024 to Summer 2026"; the county still listed the project in this phase on October 26, 2026.

    The project website says final design has an “Anticipated Start in 2028”. A first briefing for local officials was held virtually on April 17, 2025. The other meetings the website lists for 2025 are still marked “TBD”.

  3. Litigation Resolved

    Committee authorizes the Larken settlement — link to this entry

    The Committee authorized a settlement under which the township would permit "small scale logistics facilities" as a principal permitted use in the LI district and the Larken companies would dismiss their suit, according to Patch.

    The settlement led to a master plan amendment in January 2025 and an ordinance amendment in February 2025.

  4. Land use and development Resolved

    Planning Board asked to study adding Lot 6 to the Sunnymead area — link to this entry

    Resolution R-255-2024 directed the Planning Board to investigate whether Block 182, Lot 6 (about 4.37 acres) should be designated a non-condemnation area in need of redevelopment.

    The lot is next to the landfill and is in a residential zone.

  5. Roads and utilities Pending

    Route 206 widening resumes with a new contractor — link to this entry

    Work on the Doctors Way–Valley Road widening resumed in August 2024 with Roman Asphalt as the new contractor, according to Patch. The completion date moved to 2026.

    Patch reported that Roman Asphalt was named the new contractor and that work resumed in August 2024. The Hillsborough Beacon also reported the new contractor. The original completion date had been 2024; press reports of it differ.

  6. Open space and environment Resolved

    Committee authorizes a state farmland preservation application for the Mindel tract — link to this entry

    The Township Committee authorized the Planning Director to apply to the State Agriculture Development Committee to preserve the township-owned Mindel tract.

    This step is recorded in the recitals of the October 14, 2025 resolution approving the SADC option agreement. The April 9, 2024 minutes themselves were not reviewed for this entry.

  7. Litigation In court

    Lawsuit over the depot property filed against the township, county and SCIA — link to this entry

    Donald J. Volkert, as Special Fiscal Agent on behalf of Hillsborough Properties, LLC, sued the Somerset County Improvement Authority, Hillsborough Township and Somerset County in Superior Court (SOM-L-001705-24).

    The case was filed in the Law Division in Somerset County. The township’s later settlement resolution says only that the plaintiff “makes numerous allegations and asserts various causes of action against the Township.” The filing date and complaint were not found; the docket number indicates 2024. The township later said the litigation delayed the solar project.

  8. Land use and development Pending

    Township begins the Envision Hillsborough master plan reexamination — link to this entry

    "Starting in 2024, Hillsborough began the process of undertaking a Master Plan reexamination," the township says. The effort is branded Envision Hillsborough.

    The base master plan dates from 1965–66, revised through 1996, and has been amended element by element since.

2023 6 entries

  1. Open space and environment Resolved

    Committee approves $9.5 million purchase of two warehouse sites — link to this entry

    Ordinance 2023-15 authorized buying 1170 Millstone River Road and 303 Amwell Road, both with pending warehouse applications, for $9.5 million. 303 Amwell Road was reported acquired in January 2026; no closing record for 1170 Millstone River Road has been found.

    The Committee introduced Ordinance 2023-15 on October 24, 2023. It authorized buying two properties to stop pending warehouse applications:

    PropertyAcresPrice
    1170 Millstone River Road17.42$5.3 million
    303 Amwell Road11.29$4.2 million

    Patch and TAPinto reported that the Committee approved the purchase on November 28, 2023. In December 2025 the Planning Board’s attorney still described 303 Amwell Road as a property the township “is in the process of attempting to acquire.” On January 22, 2026 the application there was withdrawn, and the Township Planner told the Board the township attorney had informed them the property had been acquired, “deed in hand.” The 1170 Millstone River Road application was also withdrawn (escrow released March 10, 2026, R-113-2026), but no record of that closing has been found.

  2. Land use and development Resolved Key moment

    Township subleases depot land for a solar facility — link to this entry

    The Township Committee approved a Land Sublease Agreement with Belle Mead Depot Solar, LLC to develop, own and operate a solar energy facility on land the township holds under a lease-purchase agreement with the SCIA (R-342-2023).

    The resolution is described in the recitals of the March 10, 2026 second amendment, which says the property is “the subject of a Lease Purchase Agreement that the Township has entered into with the Somerset County Improvement Authority.” The size of the facility and the rent are not in the public record.

  3. Land use and development Resolved Key moment

    Township sells the landfill site to Sunnymeade Ventures — link to this entry

    The township and Sunnymeade Ventures signed a Redevelopment and Property Sale Agreement, and title to the landfill later passed to the company. The agreement anticipated adding the neighbouring Lot 6.

    The sale price is not stated in the resolutions LocalWhy has read.

  4. Land use and development Resolved Key moment

    Ordinance 2023-08 removes warehouses as a permitted use in industrial zones — link to this entry

    The Township Committee removed "warehousing, shipping and receiving facilities" as a permitted principal use in the I-1, I-2, I-3, GI and LI industrial districts.

    The ordinance is recited in the township’s later settlement resolution and in Ordinance 2026-01. Owners of industrial property sued to overturn it; the township has since settled two of those suits.

  5. Roads and utilities Pending Key moment

    NJDOT halts the Route 206 widening and ends its first contract — link to this entry

    NJDOT stopped work on the Doctors Way–Valley Road widening and terminated its contract with Konkus Corporation. The press reports give different months: April 2023 (Hillsborough Beacon) and May 2023 (Patch).

    The halt left the half-built road in place for more than a year. NJDOT has not published the terms of the termination, and LocalWhy found no NJDOT document giving the date. The two press accounts disagree on the month.

2022 4 entries

  1. Litigation In court

    Harvard Way developer sues over the denial — link to this entry

    Harvard Way JMJ4 sued the township and its Planning Board over the denial in Somerset County Superior Court on December 22, 2022, according to MyCentralJersey.

    MyCentralJersey reported that the complaint said the developer would also sue in federal court; LocalWhy has not confirmed a federal filing. LocalWhy has not seen the complaint or found a docket number.

  2. Township government Pending

    Attorney General sets statewide rules for police license-plate readers — link to this entry

    Attorney General Directive 2022-12 set the rules every New Jersey police department follows for license-plate readers: three-year retention, limits on searching stored data, a yearly audit, and complaints to the County Prosecutor. It took effect January 23, 2023.

    Main points:

    • Retention. “Records and ALPR data covered by this Section shall be retained for three years,” then purged unless tied to an active case.
    • Searches. Stored data that did not trigger an alert may be searched only for a listed purpose, and every access is logged.
    • Sharing. New Jersey agencies share through a statewide system. Sharing outside New Jersey needs a written agreement approved by the State ALPR Coordinator.
    • Ownership. The data belongs to the police agency, “not any ALPR vendor.”
    • Audits. Each agency audits its own program by January 31 every year.
  3. Land use and development Resolved

    Planning Board denies the Harvard Way warehouse — link to this entry

    The Planning Board denied Harvard Way JMJ4's 107,366 sq ft warehouse at 3 Harvard Way, off Route 206, in the I-3 zone. Its written resolution followed on November 10, 2022.

    The application (Block 58, Lot 1.09) sat beside the Green Hills community. MyCentralJersey reported the denial as unanimous, after six hearings.

  4. Open space and environment Resolved Key moment

    Township buys the 440-acre Mindel tract for $14 million — link to this entry

    Hillsborough bought the Mindel tract, about 440 acres of farmland at Hamilton and Amwell Roads, for $14,000,000, according to the 2026 ordinance that later sold its development rights.

    Ordinance 2026-03 states that “the Township purchased the Property on January 6, 2022 for $14,000,000.” The land is Block 198 Lot 2, Block 198.01 Lot 1, Block 198.02 Lot 1.01 and Block 199.02 Lot 1, about 440.327 acres in all.

    The township’s March 2026 announcement says it bought the tract “after being approached by the Mindel family,” and that the land had faced proposals for “a natural gas power generation facility, high-density housing, and warehouse complexes.” That announcement dates the purchase to 2021 in one place and 2022 in another; the ordinance’s date is used here.

2021 2 entries

  1. Open space and environment Pending Key moment

    Remnants of Ida flood Hillsborough — link to this entry

    The remnants of Hurricane Ida struck on September 1–2, 2021. Township records tie Ida to a badly damaged detention basin behind Harvard Way, to Blue Acres buyout applications and to a revised FEMA flood map panel.

    The township’s Blue Acres page refers to homes “destroyed or damaged when the remnants of Tropical Storm Ida impacted New Jersey in September 2021.” The Harvard Way basin, damaged in the storm, took until December 2025 to rebuild. FEMA’s revised map for panel 137, along River Road near the Studdiford bridge, includes a minor revised flood area due to Ida, the Committee was told. No count of damaged homes in Hillsborough was found in township records.

  2. Roads and utilities Pending

    Route 206 widening between Doctors Way and Valley Road begins — link to this entry

    NJDOT began widening Route 206 from south of Doctors Way to north of Valley Road, to two lanes each way with a concrete median and new jughandles, under a $42 million contract.

    Construction on the stretch press reports call “Phase 2” began in March 2021, according to the Hillsborough Beacon. NJDOT’s project page describes the job: two lanes in each direction with a concrete median barrier, jughandles at Triangle Road, Valley Road and near Camplain Road, a regraded Falcon Road, a replaced culvert and a new bridge near Valley Road, drainage basins, and new lighting and signals. The southbound noise wall between Farm Road and Doctors Way was finished in May 2022.

2020 1 entries

  1. Roads and utilities Pending Key moment

    Picket Place bridge clears concept development and moves to engineering — link to this entry

    Local Concept Development for the county bridge replacement was completed in summer 2020, and the project was approved to advance to preliminary engineering.

    This was the gate between studying options and engineering a chosen design. The county later sought a consultant for the engineering stage (RFP #CY-COM-9003-23, released August 16, 2023).

2019 2 entries

  1. Roads and utilities Pending

    County presents its preferred design for the Picket Place bridge in Hillsborough — link to this entry

    At its second public information meeting, held in the Hillsborough municipal courtroom, Somerset County presented a Preliminary Preferred Alternative for replacing the CR 567 bridge over the South Branch of the Raritan.

    The first meeting, on the project’s purpose and need, was held in Branchburg on May 2, 2019. The preferred alternative, per the project FAQ, has 12-foot lanes, 8-foot bicycle-compatible shoulders and a 6-foot sidewalk on the south side. The 2019 presentations and boards, including a staging board, are in the project’s documents library.

  2. Open space and environment Pending

    Federal investigation finds TCE in groundwater under the North Parcel — link to this entry

    GSA began a remedial investigation of groundwater on the North Parcel and found trichloroethylene (TCE) above New Jersey standards. Sampling to map the plume ran from October 2019 to February 2025.

    GSA says TCE and carbon tetrachloride in the groundwater exceed state standards and that it expects “active treatment followed by long-term monitoring” to be needed.

2018 1 entries

  1. Land use and development Resolved

    Planning Board adopts the 2018 master plan reexamination — link to this entry

    The Planning Board adopted Hillsborough's most recent general master plan reexamination report. It is the baseline the Envision Hillsborough update starts from.

    The township’s master plan page gives the adoption date as both November 29 and November 30, 2018.

2009 2 entries

  1. Land use and development Resolved

    Township seeks a partner to close and redevelop the landfill — link to this entry

    The township solicited statements of interest for closing the landfill and redeveloping the site. Sunnymeade Ventures, LLC offered to take on closure and monitoring in return for title and a redevelopment plan.

    From 2009 the township and Sunnymeade Ventures pursued a closure and monitoring plan with the state Department of Environmental Protection. The township installed a passive methane mitigation system, which the company later added to.

  2. Land use and development Pending

    South Parcel of the depot goes to the county improvement authority — link to this entry

    GSA transferred the remaining roughly 464 acres of the depot, the South Parcel, to the Somerset County Improvement Authority. The SCIA is responsible for cleaning up two areas on it.

    The two areas are a Motor Pool Area, with groundwater contamination, and a Battery Casing Area, with soil contamination. GSA says proceeds from the property sale have partly paid for the cleanup.

2007 1 entries

  1. Land use and development Resolved

    Sunnymead landfill declared an area in need of redevelopment — link to this entry

    The Township Committee designated the former landfill on Sunnymead Road (Block 182, Lot 7.02, about 10.71 acres) an area in need of redevelopment.

    The designation, under the Local Redevelopment and Housing Law, allows the township to adopt a redevelopment plan for the site. It is recited in the township’s March 24, 2026 resolution.

1942 1 entries

  1. Open space and environment Pending

    Army establishes the Belle Mead depot — link to this entry

    The Army acquired about 868 acres for the Belle Mead depot and activated it on August 10, 1942. About 800 acres passed to the General Services Administration in 1958, which used it to store federal supplies.

    GSA stored “batteries, paint, petroleum products, propane, pesticides, solvents, and strategic metals” at the depot. In November 1986 GSA transferred the roughly 335-acre North Parcel to a private owner; it has had several owners since and is now controlled by the Somerset County Improvement Authority (SCIA). GSA’s cleanup duties are set out in an April 2000 agreement with NJDEP.