The record

Timeline

Every dated step in the decisions Branchburg residents are following — assembled from township and county records, ordinances, court filings and notices, with the citation for each one attached to the entry.

Entries
82
Citations
177
Meetings on the record
22
Covering
1980 — 2026

Where this stands

Where the issues residents are following stand now.

  • The school bond referendum. Two questions on the Nov. 3 ballot: $15,028,799 for Stony Brook, Whiton and Branchburg Central Middle School, and $19,852,100 for a Stony Brook addition, effective only if Question 1 is also approved. The Board of Education approved both questions on Aug. 13, 2026.
  • Data centers. Raised in public comment at the July 27 and Sept. 14 Township Committee meetings, with members responding; the Committee has introduced no ordinance.
  • The municipal annex. The Committee adopted Ordinance 2026-1518 on Sept. 28, 5–0, appropriating $18,060,000 for an annex with a new police headquarters and authorizing $17,200,000 in bonds or notes. Talks to acquire Old York School continue.
  • Route 202 safety. After the Oct. 26 fatal crash at Holland Brook Road, the mayor’s Oct. 28 letter demanded NJDOT immediately close all unsignalized crossings and U-turns; his Oct. 30 statement said NJDOT is “actively working toward a solution” and that closing the intersection without a comprehensive assessment would shift risk to residential streets.
  • Land-use applications. The Board of Adjustment carried the 953 Route 202 treatment facility to Dec. 1, and 22 Readington Road is noticed for a Nov. 10 special hearing; the register lists each application and its outcome from the boards’ minutes.
  • The housing plan. The 255-unit obligation was settled with Fair Share Housing Center in March 2025; Ordinances 2026-1507, 2026-1508 and 2026-1509 were adopted 5–0 on March 9, 2026, and the court certified final compliance on April 15, 2026, with monitoring through June 30, 2035. The mechanisms remain proposed.
  • The 2026 budget. Adopted April 27, 2026, 5–0: $28,437,328.59 in appropriations and a $16,504,732 municipal-purpose levy, 9.98% above 2025.
  • Floodplain rules. Ordinance 2026-1519, introduced Oct. 12, has its public hearing carried to Nov. 9 for the Planning Board’s consistency review.
  • Sewers and open space. The Fox Hollow sewer MOU’s first deadline is Dec. 31, 2026, with FH Golf Partners’ sewer-access litigation pending; the Township is designing a sewer for the Miller Avenue “A-Green” area; signs are ordered for two new open-space parcels.

Entries dated in the future are deadlines or scheduled dates from the record, not predictions. Where sources conflict, the entry says so and cites both.

How to read an entry

  • 16 entries are marked “Key moment.” They carry a heavier rule and a larger headline — the pivots in the story.
  • Status says where a thing stands: milestone, resolved, active, in court, or pending.
  • Sources close every entry. Where an event happened at a catalogued meeting, a “Watch this moment” link opens the township’s video at the exact second.

Jump to: 2026 2025 2024 2023 2022 2021 2020 2019 1980

Filter the timeline

Topic
Status

Showing all 82 entries

2026 44 entries

  1. Land use and development Pending

    Special Board of Adjustment hearing noticed for the 22 Readington Road sports facility — link to this entry

    Commerce Park Investors XII LLC's application (case 2026-006AUV PFSP) to turn the former industrial building at 22 Readington Road into an all-recreational indoor sports facility, heard Sept. 1, 2026 and carried for a parking plan and revised site plan, has a continued hearing noticed for a special Board of Adjustment meeting on Nov. 10, 2026 at 7:30 p.m.

    At the Sept. 1 hearing, the applicant’s attorney, Michael E. Silbert, described the property (Block 9.02, Lot 28, I-1 zone) as a corner lot of about 9.95 acres with an existing single-story building of about 83,000 square feet, and said the plan, once 70% recreation and 30% light industry, is now 100% recreational, needing a D(1) use variance. Two tenants, Soccer World and Onkar Ventures (Yugo Sports Arena), had signed leases. The site plan shows 124 parking spaces and a banked-parking plan adding 49; the Board’s traffic consultant, Jay Troutman, said the facility “absolutely needs” all 170 spaces. The Board unanimously carried the case to Dec. 1, 2026 without further notice, with the time to act extended to Dec. 31, so the applicant could provide a comprehensive parking plan, including ADA parking, and a fully developed site plan.

    The continued-hearing notice, published Oct. 26, 2026, describes the roughly 433,510-square-foot tract and a revised plan of interior fit-outs of building units A–H for indoor recreational, fitness, wellness and athletic-training uses, with parking, driveway and stormwater improvements and no new buildings. It lists the D(1) use variance, possible relief from the multiple-principal-buildings prohibition, and a C variance for the 35-foot frontage buffer required along Meister Avenue.

  2. Elections Pending Key moment

    School bond referendum goes to Branchburg voters — link to this entry

    Voters decide School Bond 1 ($15,028,799 for Stony Brook, Whiton and Branchburg Central Middle School) and School Bond 2 ($19,852,100 for a Stony Brook addition, effective only if Question 1 passes) in the Nov. 3, 2026 general election. Polls are open 6 a.m.–8 p.m.

    Early voting ran Oct. 24–Nov. 1 at Somerset County sites, and vote-by-mail ballots could be returned to the secure drop box at the Branchburg Municipal Building until 8 p.m. on Election Day. The County Clerk’s page, as saved on the research date, said unofficial results would post after polls close and final certification on Nov. 18, 2026.

  3. Roads and utilities Pending

    Picket Place project site still lists preliminary engineering as current — link to this entry

    Captured Oct. 30, 2026, the project website still labels Local Preliminary Engineering the "Current Phase: Fall 2024 to Summer 2026," past the stated phase end, and its 2025 meeting listings still read "TBD." The site gives no completion date for the phase.

    The home page lists the environmental document, preliminary plans and preliminary engineering report as preliminary-engineering tasks without completion dates. Final design and right-of-way acquisition carry an anticipated start in 2028 and construction a design-dependent start.

    Somerset County’s project page, read Oct. 31, 2026, describes the project as in the Local Preliminary Engineering phase, in which engineering and environmental studies are to obtain Federal Highway Administration approval of the environmental document. The NJTPA Transportation Improvement Program for FY2026–2029 (project N1807) estimates the total cost at $18.616 million and programs $1.9 million for design in fiscal 2027 and $50,000 for right-of-way in fiscal 2028, with $15.8 million for construction listed for 2030–2035.

  4. Roads and utilities Pending

    Mayor says NJDOT is 'working toward a solution' on Route 202 — link to this entry

    Mayor James Schworn's status statement said the township "received a positive response and have been advised that NJDOT is actively working toward a solution," while stating his belief that closing crossings without a comprehensive traffic safety assessment could shift risk to residential streets and the Old York Road (Centerville) crossing.

    The Mayor thanked Commissioner Priya Jain for her prompt response and said the Township will remain actively involved and he will continue to provide status updates. Two days earlier his letter had asked NJDOT to close all unsignalized Route 202 crossings immediately; the Oct. 30 statement says he understands suggestions to close the intersection but favors a comprehensive solution.

  5. Roads and utilities Pending Key moment

    Mayor demands NJDOT immediately close Route 202's unsignalized crossings — link to this entry

    Mayor James Schworn's letter to NJDOT Commissioner Priya Jain formally requested the immediate closure of all unsignalized crossings and U-turns along Route 202 in Branchburg, a meeting with NJDOT leadership and a concrete timetable, stating four fatalities and numerous serious non-fatal accidents on the corridor over the preceding two years.

    The letter says the crossings “should not remain open while the Department conducts prolonged studies or considers future improvements,” asks NJDOT to identify interim measures “without waiting for the completion of a comprehensive analysis,” notes that “the State has jurisdiction over this roadway,” and states the Township will pursue every available option — including taking direct action to close or restrict hazardous crossings and turning movements — if NJDOT fails to act. The four-fatality count is the Mayor’s, stated in the letter.

  6. Land use and development Pending

    Planning Board takes up 3083 Route 22 East and a Chipotle at 204 Raritan Valley College Drive — link to this entry

    The Planning Board's Oct. 27, 2026 agenda listed two site-plan applications: 3083 Route 22E, LLC's 68,956-square-foot manufacturing, storage and office building on undeveloped land at 3083 Route 22 East (case 2026-004P PFSP) and RVCD LLC's 2,385-square-foot Chipotle Mexican Grill with a drive-through pick-up lane replacing a vacant bank at 204 Raritan Valley College Drive (case 2026-005P PFSP). The Board's minutes of the meeting come up for approval at a later meeting.

    The agenda describes 3083 Route 22 East (Block 10, Lot 8) as 5.47 acres of undeveloped land in the I-1 Industrial zone, with frontage on Route 22 East and Station Road, across Station Road from the Raritan River Corridor district. The proposed building has 17,660 square feet of manufacturing, 45,296 square feet of storage associated with the manufacturing and 6,000 square feet of office, with parking, loading docks, stormwater management, retaining walls, lighting and landscaping. The applicant’s notice, published Oct. 17, seeks bulk variance relief for retaining walls over six feet and describes the use as permitted and “not intended to be used as a warehouse.”

    The agenda describes 204 Raritan Valley College Drive (Block 6, Lot 16) as a 1.24-acre lot in the R/S-1 Retail Service zone, with frontage on Route 22 East and Raritan Valley College Drive, occupied by a vacant 2,446-square-foot bank to be demolished to its foundation. The applicant’s notice lists 20 outdoor seats and variances for 48.7% impervious coverage where 40% is the maximum, trash-enclosure setbacks of 15.46 feet (rear) and 4.20 feet (side) where 25 feet is required, and a second façade sign without frontage.

    The same agenda listed the Board’s master-plan consistency review of floodplain Ordinance 2026-1519.

  7. Roads and utilities Pending

    Mayor's first statement after the Route 202 crash — link to this entry

    A Township statement from Mayor James Schworn said improvements to Route 202 fall under NJDOT's sole authority, that the Township was compiling accident information and would contact NJDOT about safety improvements, and that it would explore financing the improvements itself if funding stood in the way.

    The statement, on Route 202–Holland Brook Road intersection safety and planned improvements, offers condolences after the recent accident at the intersection and says the Township had discussed safety improvements with NJDOT, including earlier plans “having a developer fund certain traffic improvements as part of its approved site plan.”

  8. Open space and environment Pending

    Floodplain ordinance hearing to be carried to Nov. 9 for Planning Board review — link to this entry

    The Township Committee's Oct. 26, 2026 agenda listed the second reading of floodplain Ordinance No. 2026-1519 and said its public hearing would be carried to Nov. 9, 2026, to give the Planning Board more time for its master plan consistency review, which the Board's Oct. 27 agenda lists.

    The agenda states: “The Public Hearing will be carried to the meeting on November 9, 2026, to allow the Planning Board additional time to complete its consistency review,” and lists a motion to carry the hearing to that date. The ordinance itself directs the Planning Board to report within 35 days of referral on any inconsistency with the master plan. The packet’s copy of the ordinance has a blank adoption block. The minutes of the October 26 Committee and October 27 Planning Board meetings had not yet been posted on October 31, 2026.

  9. Roads and utilities Pending

    Fatal crash at Route 202 and Holland Brook Road — link to this entry

    A crash at the Route 202 and Holland Brook Road intersection took a life. The Mayor's Oct. 27 statement offered condolences after the accident at the intersection, and his Oct. 28 letter to NJDOT says "the most recent fatality occurred just two days ago."

    The Mayor’s letter counts four fatalities and numerous serious non-fatal accidents on Route 202 in Branchburg over the past two years. NJDOT had closed the Route 202 U-turn at Holland Brook Road in December 2025 to prepare for future work, and in March 2026 the Township Administrator said a traffic signal there should be in place within the next year.

  10. Elections Pending

    County mails sample ballots carrying the school bond questions — link to this entry

    Somerset County's Oct. 21 notice said sample ballots were mailed that day to active voters who had not requested a vote-by-mail ballot. The sample ballot carries Branchburg's School Bond 1 ($15,028,799) and School Bond 2 ($19,852,100) questions.

    The notice states that a sample ballot is not an official ballot for casting votes. The ballot’s public-questions section prints the full authorization language for both bond questions, including the 40% state debt-service aid percentage and the condition that Question 2 takes effect only if Question 1 is also approved.

  11. Open space and environment Pending

    Floodplain Ordinance No. 2026-1519 introduced, 3–0 — link to this entry

    The Township Committee introduced Ordinance No. 2026-1519, revising the Township's flood damage prevention rules to continue participation in the National Flood Insurance Program, 3–0 (Young, Beatrice, Schworn; Columbus and Owens absent), with a public hearing set for Oct. 26, 2026.

    Mayor James Schworn said the ordinance is required by the NJDEP to comply with changes to the Flood Management Plan and to maintain participation in the National Flood Insurance Program. It was introduced on motion of Mr. Thomas Young, seconded by Mr. Brendon Beatrice, and published October 13, 2026.

    The text, in the Committee’s October 26 agenda packet, revises Article VIII, “Flood Plain Management,” of the Land Development Ordinance. It lists November 13, 2026 as the effective date for eight FEMA map panels; measures state-regulated flood hazard areas to NJDEP’s “Climate-adjusted Flood Elevation” on the Raritan River and its branches, Holland Brook, Chambers Brook, the Lamington River and Pleasant Run; generally requires one foot of freeboard above the best-available flood elevation; names the Zoning Officer the Floodplain Administrator; and sets fines of up to $2,000.

  12. Land use and development Pending

    Board of Adjustment takes up the 968 Route 202 hotel-to-apartments application — link to this entry

    The Board of Adjustment's Oct. 6, 2026 agenda listed Briad Development LLC's application (case 2026-003AUV MSP) to convert the 131-room hotel at 968 Route 202 South (Block 44, Lot 32, R/S-2 zone) into 88 rental apartments, with a d(1) use variance and minor site-plan approval. The applicant's notice describes a 20% affordable set-aside. The Board's minutes of the meeting come up for approval at a later meeting.

    The agenda’s summary describes a 5-acre lot in the R/S-2 zone with a 113,837-square-foot, three-story hotel and 155 parking spaces. The site-plan work includes 16 new parking spaces, new signage, updated stormwater infrastructure and landscaping changes. The applicant is represented by Michael P. Castore.

    The applicant’s notice, published Sept. 24, 2026, states that apartment buildings are not a permitted use in the R/S-2 Retail Service zone, and that transition-buffer relief along the western property line, previously granted, continues to be sought. It says plans are on file with the Land Use Coordinator in the Engineering Department and that the hearing could be continued without further notice.

  13. Land use and development Resolved

    Board of Adjustment memorializes its approval of The Training Center at 3087 Route 22 (BOA 2026-015) — link to this entry

    The Board of Adjustment approved The Training Center's application for a vocational training school in about 26,000 square feet of an existing building at 3087 Route 22 East, 7–0, at a Sept. 22, 2026 special meeting (case 2026-011 AUV PFSP). The Oct. 6 agenda listed the memorializing Resolution BOA 2026-015, and a Township public notice states the Board adopted it that night, with conditions.

    At the Sept. 22 special meeting, the applicant’s attorney, Brian Tipton, sought preliminary and final site-plan approval with design waivers and two use variances: one for a vocational school, an educational use, in the I-1 industrial zone, and one for two principal uses in the same building (Block 10, Lot 7). Dan Moscatiello, an owner and the COO, said the family-owned trade school would use about 26,000 of the building’s 42,000 square feet, run classes Monday to Friday ending at 8 p.m., have about 25 staff and about 60 students at a time, and keep its existing facility open. The applicant’s engineer said 126 parking stalls are proposed where 120 are required. The applicant agreed to conditions including connecting to the public sanitary sewer and sending NJDOT a letter of no interest on its Route 22 traffic; the Board’s traffic consultant, Jay Troutman, said the numbers should go to NJDOT for review. No members of the public attended.

    The Board approved the application on motion of Vice Chair Walch, seconded by Mr. Sullivan, 7–0 (Chairman Andersen, Vice Chair Walch, Mr. Fox, Mr. Pappas, Ms. Cook, Mr. Albanese and Mr. Sullivan). The Oct. 6 agenda listed Resolution BOA 2026-015 to memorialize it; the Township’s public notice says the determinations are on file in the Engineering Department.

  14. Open space and environment Active

    Signs ordered for two new open-space parcels; dedication ceremony planned — link to this entry

    Township Administrator Gregory Bonin told the Township Committee that signs have been ordered for the Township's two new open-space parcels, on Station Road and South Branch Road, and that a dedication ceremony is being planned, with no date yet.

    At the August 10, 2026 Committee meeting, Mr. Bonin said the Township was working on the wording of signs dedicating the Sempre and Advance properties as open-space parcels, with a ceremony to follow. He reported the signs ordered at the September 28, 2026 meeting. The minutes do not give tax-map lots for the parcels.

  15. Township government Resolved Key moment

    Committee adopts $18.06M bond ordinance for the municipal annex, 5–0 — link to this entry

    The Township Committee adopted Ordinance No. 2026-1518, appropriating $18,060,000 for the construction of a municipal annex and authorizing $17,200,000 in bonds or notes, 5–0 with no public comment. The Mayor said the annex will house a new Police Headquarters and Emergency Management Office, partly offset by a $2.25 million federal grant.

    The ordinance was introduced unanimously on September 14 and adopted on motion of Mr. Owens, seconded by Mr. Young; recorded vote 5–0 (Aye: Young, Columbus, Owens, Beatrice, Schworn). It includes an $860,000 down payment from previously adopted budgets, sets a 30-year period of usefulness, and directs any grant money to the cost or to paying down the debt. Mr. Young said the grant lets the Township use debt-service roll-off for part of the cost; the Mayor said maturing bonds let the Township absorb part of the new debt “without incurring a tax increase,” and that the Township is still in discussions with the Board of Education to acquire Old York School. Administrator Gregory Bonin said construction should take about two to three years from authorization to proceed. The 2026 capital program separately plans $20,000,000 for “Municipal Complex Improvements.”

  16. Land use and development Active

    Board of Adjustment opens the 953 Route 202 treatment-facility hearing; carried to Dec. 1 — link to this entry

    The Board of Adjustment heard the prospective operators of Branchburg Medicorum LLC's proposed 40-patient residential detoxification and substance-use treatment facility in an existing office building at 953 Route 202 North (case 2026-001 AUV PFSP) and took questions from seven members of the public. The case was carried to the Board's Dec. 1, 2026 meeting without further notice, with the Board's time to act extended to Dec. 31.

    The property is Block 55, Lot 7, a 2.12-acre lot in the R/S-2 zone with an existing two-story, 16,000-square-foot commercial building. The applicant’s attorney, Lawrence A. Calli, said the use is conditionally permitted in the zone, that the deviations concern buffers to abutting uses and mostly go with the existing building and its setbacks, and that the applicant seeks D3 relief with preliminary and final site-plan review. The notice lists a front-yard setback of 111.1 feet where 100 is the maximum, a lot width of 197 feet where 200 is required and a 25-foot transition to lower-intensity uses where 50 is required, and describes 20 resident rooms with 40 patient beds and 46 parking spaces.

    Samuel Kesaris of USR Holdings, the main operator, and James Mikhail of Omnia Holdings NJ LLC, the co-operator, testified. In the minutes’ account, Mr. Kesaris said it is not a walk-in facility: patients call an admissions center and are background-checked, and sex offenders and court-mandated patients are not accepted, that census is capped at 40, that about 12–18 staff are on site at a time, and that access is badge-controlled with alarms, cameras and checks every 30 minutes. Mr. Calli said any use variance would run with the property, with conditions on the use rather than the operator; Mr. Kesaris agreed to a condition that no outpatient programs come to the site.

    Rebekka Zydel, Glenford Warmington (an attorney for River Trace Condos), Markette Harris, Yuriy Boltyah, Jennifer Testa, Adam Perahia and Maria Kron asked questions, on smoking breaks and the buffer to the neighborhood, noise, night emergency calls, staffing, a traffic study, property values, visitors and whether staff can stop a patient from leaving. The Board carried the case to Dec. 1, 2026 without further notice.

    At the same meeting the Board approved, 7–0, a front-yard setback variance for a home addition at 40 Harlan School Road (case 2026-009A HV), reducing the setback from 73.19 feet to about 66.09 feet where 75 is required.

  17. Open space and environment Resolved

    Wildlife Management Committee reports; Committee moves to approve the 2026–2027 deer season — link to this entry

    Wildlife Management Committee chairman Larry Fox presented the 2025–2026 deer-harvest report and recommended adding the Sempre property to the approved hunting areas and opening some leased farm sites that are not actively hunted. On motion of Mr. Young, seconded by Mr. Beatrice, the Township Committee moved to approve the 2026–2027 deer hunting season.

    The minutes say Mr. Fox outlined the committee’s recommendations for the coming season: including the Sempre property as an additional parcel in the approved hunting areas, and opening to hunters some farmed sites that the farmers who lease them are not actively hunting.

    In public comment, Christine Bliss of Woodfern Road asked about the report and the growing deer population, raising concern that development is displacing deer. Mayor Schworn said significant development is also occurring in neighboring municipalities, that future development may slow or stall with economic conditions, and that several approved developments in the Township have not been fully cleared or advanced. See the September 14, 2026 Committee meeting.

  18. Data centers Pending

    Resident asks the Committee to study data centers before any ban — link to this entry

    In public comment at the Sept. 14, 2026 Township Committee meeting, resident Mike Dolan asked the Township to weigh data centers' benefits and drawbacks before adopting any ban. Mr. Young, Mayor Schworn and Mr. Owens responded; the Committee took no action.

    Mr. Dolan said the September edition of the Branchburg News gave him the impression there had been public comment favoring an outright prohibition. According to the minutes, Mr. Thomas Young said residents should review the Governor’s recent position on data centers, which he described as reasonable and balanced, and that the Township should not discourage data centers serving legitimate business purposes. Mayor James Schworn said the Legislature’s recent data-center legislation is “quite robust,” that the data centers now operating in the Township provide positive ratables, and that he does not anticipate more locating in Branchburg in the near term. Mr. David Owens said the governing body remains committed to residents’ interests while fostering an environment that lets businesses remain and expand.

  19. Elections Pending

    Board of Education puts two school bond questions on the Nov. 3 ballot — link to this entry

    At a special meeting on Aug. 13, 2026, the Branchburg Board of Education adopted, by unanimous roll call, a resolution submitting two bond questions ($15,028,799 and $19,852,100; $34,880,899 in all) with an explanatory statement to the voters at the Nov. 3, 2026 election.

    Seven members were present (Michael Blaustein, Vincent Carpentier, Jeffrey Celebre, Puja Desai, Kenneth Hallenbeck, Robert Maider and Charles Tuma); Nat Krishnamurti and Megan Smith were absent. The resolution was moved by Mr. Tuma and seconded by Ms. Desai; there was no public comment. Its explanatory statement gives combined final eligible costs of $17,312,862, with 40% state debt-service aid on those costs. Under the resolution, the Township’s Chief Financial Officer prepared a Supplemental Debt Statement filed with the Township Clerk, and the Board agreed to fund locally any excess costs. Board President Carpentier introduced Dr. Christine Burton as the Liaison for Referendum Communication.

  20. Roads and utilities Pending

    2025 audit reports the sewer utility's year — link to this entry

    The 2025 Township audit, dated Aug. 3, 2026, reports sewer use charges of $3,374,484.41, a sewer levy of $3,411,353.34, $5,856,000 of utility appropriations and a Dec. 31, 2025 operating fund balance of $4,249,338.76, down from $4,861,736.70.

    The audit also lists $321,466.67 in capacity charges, $7,849,602.06 in total revenues and other income, and $2,606,000 of fund balance used. Its capital schedules show fixed capital rising from $9,403,696.57 to $14,249,191.45 after $4,845,494.88 of completed projects, and list Neshanic Pump Flood Mitigation at $3,000,000 authorized and uncompleted under ordinance 2021-1418. The Township Committee acknowledged the 2025 audit on Sept. 14, 2026 (Res. 2026-156, 5–0 consent).

  21. Roads and utilities Pending

    2025 audit reports road-repair and snow-removal spending — link to this entry

    The 2025 Township audit, dated Aug. 3, 2026, reports road repair and maintenance appropriations of $1,746,000 in wages and $644,500 in other expenses, with $1,548,531.60 and $475,984.51 paid/charged, and a $1,000,000 road-improvement reserve of which $997,762.50 was expended.

    Snow removal was budgeted at $100,000 in wages and $135,000 in other expenses, with $100,000 and $111,095.79 paid/charged. These are summarized schedules of 2025 operations, reported by category; street-by-street work details are not in them. In the 2026 adopted budget, the current-year road-improvement capital line appears as $1,300,000.

  22. Taxes and budget Pending

    2025 audit issued: unmodified regulatory opinion, no recommendations — link to this entry

    Suplee, Clooney & Company LLC's audit of 2025, dated Aug. 3, 2026, gave an unmodified opinion on the regulatory-basis statements and an adverse opinion relative to U.S. GAAP, identified no material weaknesses, and printed "NONE" under Recommendations. Year-end current fund balance: $11,801,344.22.

    The audit’s comparative schedule reports the 2025 total tax rate at $1.709 (2024: $1.804), a municipal component of $0.305, and 2025 collections of $83,899,596.59 on a levy of $84,959,605.69 — 98.75%. The annual financial statement prints a year-end surplus of $11,802,344.22, a $1,000 difference from the audit’s schedule that neither document explains. The audit also reports the bid threshold rose to $53,000 effective July 14, 2025 by governing-body resolution. The Township Committee acknowledged the audit at its September 14, 2026 meeting (Resolution No. 2026-156, consent agenda, 5–0).

  23. Data centers Pending

    Resident asks the Committee for an ordinance prohibiting data centers — link to this entry

    In public comment at the July 27, 2026 Township Committee meeting, resident Jay Tilek asked for an ordinance prohibiting data centers. Mayor Schworn said an outright ban could be difficult and that the Township had begun evaluating large-scale data centers; the Committee took no action.

    Mr. Tilek, a 13-year resident who said he is a candidate for a Township Committee seat, said the Township should act before a data-center application is submitted, that large-scale data centers consume a significant amount of electricity and other local resources, and that some neighboring towns have restricted or prohibited them. According to the minutes, Mayor James Schworn said Verizon’s presence in the Township and existing smaller data-related facilities could make an outright ban difficult, and that the Township shares concerns about added strain on local resources. Mr. Thomas Young said the Township will review other towns’ measures but cautioned against unintended consequences from overly constricted regulations, and against shutting out legitimate uses that support existing and future businesses.

  24. Roads and utilities Pending

    Lehigh Road crossing: Norfolk Southern work done, Township plans submitted — link to this entry

    Township Administrator Gregory Bonin said Norfolk Southern's maintenance work at the Lehigh Road rail crossing was complete and the Township's updated construction plans for a permanent quiet zone had been submitted to Norfolk Southern for approval.

    On April 27, 2026 Mr. Bonin said the temporary quiet zone at the crossing is a two-year permit that the Township would reapply for if the roadway is not improved before it expires. On Sept. 14 he said the Federal Railroad Administration hoped to issue an intent to proceed shortly, that the Township needs Norfolk Southern’s approval first, and that it hopes construction can be done this year or early next year; a resident raised the temporary quiet zone’s expiration in spring 2027.

  25. Roads and utilities Pending Key moment

    Committee discusses FH Golf Partners sewer-access litigation; Resolution 2026-143 supports the Upper Raritan plan amendment — link to this entry

    After an executive session on litigation FH Golf Partners, LLC initiated over sewer access for a proposed development in Readington Township, the Township Committee adopted Resolution 2026-143, supporting and consenting to the proposed Upper Raritan Water Quality Management Plan amendment, 5–0.

    The Committee went into executive session at 7:05 p.m. and returned at 7:45 p.m. Mayor Schworn then stated that it had discussed “litigation that has been initiated by FH Golf Partners, LLC regarding sewer access for a proposed development in Readington Township, along with the Township’s support for the NJDEP Water Quality Management Plan amendment.”

    Resolution 2026-143, “Resolution Supporting and Consenting to Proposed Upper Raritan Water Quality Management Plan Amendment,” passed on motion of Mr. Owens, seconded by Mr. Young (Aye: Young, Columbus, Owens, Beatrice, Schworn). The minutes also give the number 2026-143 to the motion to enter executive session, read the resolution by title only, and do not name the court, docket or claims in the litigation. The 2020 sewer-service MOU with FH Golf Partners lists a Water Quality Management Plan amendment among the approvals due by Dec. 31, 2026 under the 2023 extension. See the July 13, 2026 Committee meeting.

  26. Open space and environment Pending

    Committee authorizes the contract to sell 200 Harlan School Road — link to this entry

    In a 5–0 consent vote, the Township Committee adopted Resolution 2026-121, authorizing a contract for the sale of Township real estate at 200 Harlan School Road (Block 17.13, Lot 12.02), a lot the Administrator had said the Township no longer needs.

    At the December 8, 2025 Committee meeting, Mr. Bonin said the Township-owned lot next to the Silver Saddle Community Pool is no longer needed by the Township, shared the results of an appraisal and described the sale process; the Committee agreed to move forward with the sale. Resolution 2026-29, adopted 5–0 at the January 12, 2026 meeting, authorized an auction. The June 22, 2026 minutes list Resolution 2026-121 by title, without a buyer or price.

  27. Township government Resolved

    Committee adopts $1.5 million in capital ordinances for police, fire and Public Works — link to this entry

    The Township Committee adopted four capital ordinances, each 4–0 with no public comment and paid from existing capital funds: No. 2026-1512 ($100,000, facility improvements), 2026-1513 ($240,000, police vehicles and equipment), 2026-1514 ($1,018,000, Public Works equipment) and 2026-1515 ($150,000, volunteer fire-company equipment).

    The ordinances were introduced on May 11. Each vote was 4–0 (Aye: Columbus, Owens, Beatrice, Schworn), with Mr. Young absent. No. 2026-1513 buys and outfits three police SUVs and equipment including radar units, radios, tasers and handguns; No. 2026-1514 a street sweeper, a loader, a double drum asphalt roller and a mini asphalt track paver; No. 2026-1515 SCBA air packs, thermal imaging cameras, and fire and turnout gear for the North Branch, Neshanic, Country Hills and Readington volunteer fire companies; and No. 2026-1512 doors, a water filtration system and HVAC replacement at the Annex, Police Station and Municipal Complex.

  28. Taxes and budget Resolved Key moment

    Committee adopts the 2026 budget, 5–0 (Res. 2026-88) — link to this entry

    After a public hearing at which no one spoke, the Township Committee adopted the 2026 municipal budget by Resolution No. 2026-88, 5–0, having first passed Resolutions No. 2026-86 (the budget, read by title) and 2026-87 (authorization for self-examination), each 5–0.

    Resolution No. 2026-88 was adopted on motion of Mrs. Columbus, seconded by Mr. Young; recorded vote 5–0 (Aye: Young, Columbus, Owens, Beatrice, Schworn). The budget appropriates $28,437,328.59 — $20,004,341 within caps, $6,632,987.59 excluded from caps and a $1,800,000 reserve for uncollected taxes — and sets a municipal-purpose levy of $16,504,732. Its levy worksheet totals $87,056,045.79 across all levies, where the user-friendly budget reports $88,509,350; neither document explains the difference. In liaison reports, Mr. Owens complimented the Budget Committee, and Mr. Young said the Township is likely to face more budget stress in coming years from the affordable-housing buildouts.

  29. Litigation Pending Key moment

    Court certifies Branchburg's Fourth Round compliance — link to this entry

    The Superior Court entered a Consent Order Final Compliance Certification in docket SOM-L-142-25: the HEFSP was approved, the Fourth Round obligation set at 255 prospective-need units and 0 present-need units, and the certification granted for July 1, 2025 through June 30, 2035 with retained jurisdiction. The order lists all four Fourth Round mechanisms as proposed.

    Judge William G. Mennen’s order recites that the Township filed its declaratory-judgment action January 28, 2025, the HEFSP June 25, 2025 and the implementing ordinances and resolutions March 13, 2026; that FSHC confirmed compliance with the settlement terms; and that no other interested party filed a challenge or any other communication in the certification proceeding. It lists the prior-round obligation at 302 units (316 mechanisms, 241 bonus credits, a 14-credit surplus), the Third Round at 1,000 units with a seven-unit unsatisfied obligation carried into the Fourth Round, and the Fourth Round at 255 prospective units.

    The mechanisms table lists Whiton Hills extensions (30 age-restricted units with 15 bonuses and 44 family units with 22 bonuses), Evans Way/KRE (80 family units), Vollers/Premier (50 credits with 23 bonuses) and 147 Stony Brook Road (four special-needs credits with four bonuses), all “proposed” — 272 credits, 208 units, 64 bonuses, 265 after the carryover and a 10-credit surplus. The HEFSP reports the same table as 271.5 credits, 63.5 bonuses and a 9.5-credit surplus; the half-credit difference is unexplained in the record.

    The order requires yearly Affordable Housing Monitoring System entries by each February 15 covering trust-fund collections, balances and expenditures and unit construction, starts, certificates of occupancy and deed-control dates; deed-restriction uploads as developments come online; and a realistic-opportunity review as of July 1, 2030, on which a party may file where an inclusionary site lacks preliminary site-plan approval by the midpoint. The court retains jurisdiction to enforce the certification and the plan.

  30. Affordable housing Pending

    Board of Adjustment hears a nine-unit affordable building at 1100–1104 Route 28; carried — link to this entry

    The Board of Adjustment heard Mitras Realty's (formerly Genesis Capital) site plan and subdivision application (case 2019-006A PFSP/PFSUB) for a three-story, nine-unit, 100% affordable apartment building at 1100–1104 Route 28, a Third Round project carried into the Township's Fourth Round plan. The case was carried to July 15, 2026 without a vote.

    The application (Block 7, Lot 3) would divide the property into three lots, one for the new building and two for the existing single-family homes. Board Attorney Steve Warner said the Board granted D(1) use and D(5) density variances for the project in 2012 and that they still stand. Board Planner Kendra Lelie said the nine units earned 18 Third Round credits with bonuses and that all nine are to be deed-restricted for low- and moderate-income families; she said the three-bedroom units must be enlarged to meet the Township’s minimum size. The April 15, 2026 court order lists the project as Henderson/Genesis, nine 100% affordable units awaiting site-plan approval.

    Proposed conditions the applicant accepted included a performance bond of 120% of the cost of the affordable units to ensure completion within two years of the resolution, a developer’s agreement and a concrete bus-stop pad; the applicant also said it had no objection to providing a tot lot, which the 2012 approval called for. Two neighbors on Route 28 asked about stormwater, the sidewalk, the view of the building and the height.

  31. Township government Pending

    Committee approves a police-building design contract and a 580 Old York Road study — link to this entry

    On its consent agenda, passed 4–0, the Township Committee approved preliminary costs for a feasibility study to repurpose 580 Old York Road (Resolution No. 2026-78) and a professional architectural services contract with The Goldstein Partnership, LLC for the conceptual design of a new police building (Resolution No. 2026-80).

    The consent agenda passed on motion of Mr. Beatrice, seconded by Mr. Young; recorded vote 4–0 (Aye: Young, Columbus, Beatrice, Schworn), with Mr. Owens absent. Later bill lists include $36,000.00 to Frank H. Lehr Associates for a municipal complex survey (July 13) and $7,795.00 to The Goldstein Partnership for police building conceptual design (Aug. 10). The Committee adopted the $18,060,000 annex bond ordinance on September 28, 2026.

  32. Township government Pending

    Red Rock update: displaced residents assisted through county services; arson ruled out — link to this entry

    Mayor Schworn's March 27 update said residents displaced by the fire were being assisted through county services after the Township's initial placement, recognized Captain Ed Edgar and Health Officer Jim Norgalis as OEM lead coordinators, and stated that arson had been ruled out with preliminary findings indicating an accidental fire.

    The update said responsibility transitions to Somerset County Social Services after the initial response phase, and credited the Branchburg Parent-Teacher Organization with coordinating local relief from a central support location at River Lea Farm. It said additional details would be shared once the investigation is complete.

  33. Taxes and budget Pending Key moment

    Committee introduces the 2026 budget (Res. 2026-69) — link to this entry

    The Township Committee introduced the 2026 municipal budget by Resolution No. 2026-69, with all members in favor, and set its public hearing for April 27, 2026. It also introduced the annual cap-bank Ordinance No. 2026-1510.

    Resolution No. 2026-69 was read by title and introduced on motion of Mrs. Columbus, seconded by Mr. Young; the minutes record that all were in favor. The 2026 budget appropriates $28,437,328.59, raises the municipal-purpose levy $1,497,931 (9.98%) to $16,504,732, and sets a $2,671,898.30 open-space trust levy. Ordinance No. 2026-1510, which lets the Township exceed the appropriation limits and establish a cap bank, was introduced the same night and adopted April 13, 4–0. The Committee adopted the budget on April 27, 2026, 5–0.

  34. Open space and environment Pending

    2026 budget sets the open-space trust levy at $2,671,898.30 — link to this entry

    The 2026 municipal budget, introduced March 23, 2026 (Res. 2026-69) and adopted April 27, 2026 (Res. 2026-88, 5–0), levies $2,671,898.30 for the Open Space, Recreation, Farmland and Historic Preservation Trust Fund at a $0.0500 rate.

    The trust-fund sheet shows 2025 taxes realized of $2,462,766.50 and 2025 cash realized of $2,482,848.73, cumulative collections of $37,431,124.40 and cumulative expenditures of $27,763,006.29, and 0.000 recreation acres and 0.000 farmland acres preserved in 2025. The budget was introduced at the March 23, 2026 Committee meeting and adopted after a public hearing at the April 27, 2026 meeting, on a 5–0 recorded vote.

    The 2026 User Friendly Budget’s summary row prints the levy as $2,671,898, without the 30 cents shown on the adopted budget’s sheets.

  35. Roads and utilities Pending

    2026 budget schedules $2,540,000 of road improvements — link to this entry

    The 2026 budget, which the Township Committee introduced on March 23, 2026 and adopted on April 27, 2026, 5–0, schedules $2,540,000 for road improvements in 2026 within a $13,040,000 six-year capital line, and $950,000 in 2026 for DPW equipment within a $2,200,000 line.

    The capital program plans $2,500,000 for road improvements in 2027 and $2,000,000 in each of 2028 through 2031; DPW equipment is planned at $250,000 in each of 2027–2031. The schedule is a plan and does not by itself authorize expenditures. The adopted budget’s current-year road-improvement capital line reads $1,300,000, a different schedule the budget does not reconcile with the capital program’s $2,540,000, and neither is broken down by street. In 2026 the Committee bought resurfacing materials from Schifano Construction (Resolution No. 2026-96, May 11) and approved $996,214.10 in payments to it for road resurfacing on the June 22 and Aug. 10 bill lists.

  36. Township government Pending

    Township release: 60–80 displaced, short-term stabilization, county coordination — link to this entry

    Mayor Schworn's March 20 release estimated 60–80 residents displaced, described the Township's role as immediate emergency response and short-term stabilization, and said longer-term housing and social services are coordinated at the county level with the State and the Red Cross.

    The release said the Township remained in close communication with the Red Cross and partner organizations, thanked residents, businesses and community organizations for an outpouring of support, and directed donations through established, vetted service providers, attaching a Red Cross list of Somerset County organizations.

  37. Township government Active Key moment

    Fire at the Red Rock development displaces residents — link to this entry

    A significant residential fire at the Red Rock development on Wednesday, March 18, 2026 displaced approximately 60–80 residents, by the Township's March 20 release, which says no lives were lost.

    Branchburg Township and its volunteer fire and rescue services responded, joined by fire and rescue services from neighboring towns, according to the release. The Township worked with the property owner, Conifer Realty, and the Red Cross to secure temporary accommodations and basic necessities.

  38. Land use and development Resolved Key moment

    Committee replaces the Evans Way warehouse plan with housing, 5–0 — link to this entry

    Ordinance 2026-1508, introduced February 9, 2026 and adopted March 9, 2026, amended and replaced the Evans Way Redevelopment Plan: up to 300 apartments and 100 townhouses on Block 58, Lot 36, with 80 affordable units (20% of each type), Block 58.01, Lot 4 unchanged, and a two-acre portion contemplated for future public use. Adopted 5–0, with Resolution 2026-67 approving an amended redevelopment and affordable housing agreement with S/K Stoney Brook Associates.

    The Committee introduced the ordinance on February 9, 2026, on motion of Mrs. Columbus, seconded by Mr. Young, with all five members in favor. On March 9 it was adopted on motion of Mr. Owens, seconded by Mr. Young, by recorded vote of 5–0 (Mr. Thomas Young, Mrs. Anna Columbus, Mr. David Owens, Mr. Brendon Beatrice and Mayor James Schworn); no one spoke at the hearing.

    The amendment covers Block 58, Lot 36 (about 38.09 acres) and Block 58.01, Lot 4 (about 5 acres), plus portions of the Evans Way right-of-way. On Block 58, Lot 36 it allows up to 300 apartments with 60 affordable and 100 townhouses with 20 affordable — the HEFSP’s 400-family-unit project with an 80-unit set-aside at about 10.5 dwelling units per acre. Block 58.01, Lot 4 remains under its prior designation, where the Planning Board in October 2025 let the approved 30,000-square-foot warehouse building go ahead as phase one. The plan’s introduction contemplates future public use of a two-acre portion along Stony Brook Road; the 2022 redevelopment agreement had recited a 2.26-acre portion for municipal purposes.

    The Planning Board reviewed the ordinance for Master Plan consistency on February 10, 2026 and adopted Resolution PB 2026-011, 7–0. Board Planner Kendra Lelie said KRE had asked to be part of the Fourth Round plan, that “Branchburg agreed this was a better use of the property,” and that KRE will still need site-plan approval.

    On March 9 the Committee also approved, 5–0 on the consent agenda, Resolution 2026-67, an amended redevelopment agreement and affordable housing agreement with S/K Stoney Brook Associates. Derek Orth, counsel for KRE Developers, said construction can begin once all items are finalized and State approvals are granted, and that the project would take about 24 to 36 months from breaking ground. Township counsel filed the ordinance and plan with the court on March 13, 2026, and the April 15, 2026 compliance order lists the Evans Way/KRE 80 units as proposed.

  39. Affordable housing Resolved

    Committee adopts the AH-8 zone for the Vollers/Premier site, 5–0 — link to this entry

    Ordinance 2026-1507, introduced February 9, 2026 and adopted March 9, 2026, creates the Route 22 Affordable Housing 8 zone for the Vollers/Premier inclusionary project: up to 250 dwellings with 50 affordable credits. Mr. Thomas Young, Mrs. Anna Columbus, Mr. David Owens, Mr. Brendon Beatrice and Mayor James Schworn voted yes. The same night the Committee adopted Ordinance 2026-1509 and Resolutions 2026-64 to -67, each 5–0.

    The ordinance allows up to 250 multifamily apartment, townhouse and stacked-townhouse dwellings plus one special-needs group home, and requires 50 affordable credits: at least 46 affordable multifamily units and four special-needs bedrooms. It sets a 10% minimum open-space area and 60% maximum impervious coverage, and directs that later site-plan review refine the concept plan, which shows 31.9338 acres.

    The Committee introduced the ordinance on February 9, 2026, on motion of Mr. Young, seconded by Mr. Owens, with all five members in favor, and the Planning Board found it consistent with the Master Plan the next day (Resolution PB 2026-010, 7–0). There, Board Planner Kendra Lelie said the rear piece of the Vollers property, between North Branch Walk and Summit Green, where Premier is the developer, will connect to both communities and become the AH-8 zone. On March 9 it was adopted on motion of Mrs. Columbus, seconded by Mr. Owens; the minutes record 40 members of the public, and no one spoke at the hearing.

    The same night the Committee adopted Ordinance 2026-1508 (the amended Evans Way plan) and Ordinance 2026-1509 (affordable-housing and development fees), each 5–0, and on its consent agenda, also 5–0, Resolutions 2026-64 (affirmative marketing plan), 2026-65 (spending plan), 2026-66 (the Whiton Hills extension of affordability controls) and 2026-67 (an amended redevelopment and affordable housing agreement with S/K Stoney Brook Associates). Township counsel filed the instruments with the court on March 13, 2026.

  40. Roads and utilities Pending

    Administrator: Route 202–Holland Brook signal expected within a year — link to this entry

    Asked by Mr. Beatrice about the timeline for the proposed traffic signal at Route 202 and Holland Brook Road, Township Administrator Gregory Bonin said it should be in place within the next year.

    The exchange came during the Administrator’s report at the March 9, 2026 Committee meeting. A Township plan set dated May 20, 2024 covers Holland Brook Road improvements including traffic-signal work at the Route 202 intersection. On April 27, 2026, Mr. Beatrice asked about signal timing at Route 202 and Old York Road; Mr. Bonin said NJDOT is aware of the issue.

  41. Township government Pending

    Mayor states fire and rescue services are 100% volunteer — link to this entry

    Mayor James Schworn's February 2026 "Notes from the Dais" message states that Branchburg's fire and rescue services are 100% volunteer and unpaid, and that the Township is committed to prioritizing emergency services.

    The message, titled “Our Volunteer Emergency Services & Community Commitment,” describes administering oaths at the companies’ installation dinners and says members “leave their families in the middle of the night” to answer calls. It is the Mayor’s statement in a municipal publication. In May 2026 the Township Committee adopted Ordinance No. 2026-1515, 4–0, appropriating $150,000 for air packs, thermal imaging cameras and fire and turnout gear for four of the volunteer fire companies.

  42. Open space and environment Resolved

    Ordinance 2026-1506 creates the Parks, Recreation and Open Space Committee — link to this entry

    The Township Committee adopted Ordinance 2026-1506, 4–0, renaming the Parks and Open Space Committee the Parks, Recreation and Open Space Committee, keeping its open-space duties, adding the review of recreation programs and requiring it to meet at least quarterly.

    The ordinance, introduced at the January 12, 2026 Committee meeting, amends Chapter 24, “Open Space Conservation,” Section 24-2. As read into the minutes, the committee reviews land acquisitions and “the adequacy of existing recreation programs”; its members are a Township Committee member, the Planning Board Chair or designee, an Environmental Commission member, the Director of Recreation, the Mayor or designee (who chairs it), the Township Administrator and up to five residents on one-year terms; and it keeps an open-space map and inventory with priority rankings, gives opinions on open-space purchases and reports to the Township Committee each year.

    Mayor Schworn said the ordinance incorporates the assessment and evaluation of recreation programs into the committee’s duties. No one spoke at the public hearing. It was adopted on motion of Mrs. Columbus, seconded by Mr. Owens (Aye: Young, Columbus, Owens, Schworn). See the January 26, 2026 Committee meeting.

  43. Affordable housing Pending

    Court grants conditional compliance, requiring the AH-8 zoning ordinance — link to this entry

    Judge William G. Mennen entered a Consent Order Conditional Compliance Certification requiring the Township to adopt a new AH-8 zoning ordinance for the Vollers/Premier site, as the Township's March 13, 2026 filing recites. The Township Committee had authorized the Township to execute the consent order on December 8, 2025 (Resolution 2025-218, 5–0). The order is incorporated by reference in the April 15, 2026 final order.

    The Township’s implementing filing recites the steps between the plan’s adoption and this order: a Fair Share Housing Center request for additional information on August 28, 2025, and an October 7, 2025 case-management order requiring the Township and FSHC to confer on conditions for compliance. On December 8, 2025 the Committee adopted Resolution 2025-218, “Authorization to Execute Consent Order – Conditional Compliance Certification – Fourth Round Affordable Housing Compliance Plan,” on its consent agenda, 5–0. The January 8, 2026 order is described in the March 13 filing and recited in the April 15 final order.

  44. Open space and environment Pending

    MS4 infrastructure inventory due; plan entries still "TBD" — link to this entry

    The date shown in the Township's stormwater plan as the deadline for its MS4 infrastructure inventory totals. At the plan's Sept. 10, 2024 annual review, most categories were marked "TBD", and the plan posted on the Township website still shows them that way.

    The form’s “TBD” entries cover outfalls, groundwater discharge points, interconnections, storm drain inlets, manholes, length of conveyance and stormwater facilities; pump stations are listed as 0 and maintenance yards and ancillary operations as 2. The plan says the outfall and infrastructure map is updated as new facilities are accepted or built, and that the Township will use GPS devices to locate infrastructure. The Township Engineer, named in the plan as Stormwater Program Coordinator, can be asked for the current inventory.

2025 19 entries

  1. Roads and utilities Pending

    NJDOT closes the Route 202 U-turn at Holland Brook Road — link to this entry

    Township Administrator Gregory Bonin told the Township Committee that the Holland Brook Road and Route 202 U-turn "was recently closed by the NJDOT to prepare for future work," and that the Township would message residents when the intersection is fully closed.

    At the December 8, 2025 meeting, Mr. Bonin had said “the U-turn at Route 202 & Holland Brook Road will close shortly for improvements.” The minutes do not give the closure date.

  2. Land use and development Resolved

    Board of Adjustment approves a self-storage building at Route 202 and Imclone Drive — link to this entry

    The Board of Adjustment approved, with conditions, Sempre Property Group's application (case 2025-002AUV PFSP) for a four-story, climate-controlled self-storage building on 6.2 acres at Route 202 North and Imclone Drive (Block 68.06, Lot 1), granting a D(1) use variance in the I-2 zone with bulk variances and design waivers, 7–0. No members of the public attended. The Board adopted Resolution BOA 2025-019 on Jan. 6, 2026, 6–0.

    Self-storage is not a permitted use in the I-2 zone. The bulk relief covered four stories where 3.5 are permitted and a lot width of 326.5 feet where 350 is required, along with design waivers for front-yard parking and disturbance of steep slopes. Holland Brook crosses the rear of the property; the applicant’s engineer said the wetlands area would stay undisturbed except for a sewer lateral, and that NJDEP and NJDOT approvals are needed. Conditions included compliance with the professionals’ reviews, no light spillage past property lines, all NJDEP approvals, fire-truck access through the rear tunnel, a “Do Not Enter” sign and access gates.

    The vote, on motion of Mr. Iselin, seconded by Mr. Verbeke: Vice-Chair Walch, Mr. Cuttitta, Mr. Sullivan, Mr. Fox, Mr. Albanese, Mr. Quade and Mr. Iselin aye; Mr. Verbeke and Mr. McCartney not eligible; Chairman Andersen and Mr. Pappas absent. The January 6, 2026 meeting adopted the written resolution.

  3. Roads and utilities Resolved

    Ordinance 2025-1503 raises sewer rates — link to this entry

    The Township Committee adopted Ordinance 2025-1503, 5–0 with no public comment, raising annual sewer charges from $1.40 to $1.50 per gallon per day of projected flow for unmetered properties, from $5.38 to $5.85 per 1,000 gallons for metered ones, and minimums from $399 to $450.

    At the ordinance’s introduction on Nov. 10, 2025, Administrator Gregory Bonin said it “will add $50 to the average home on public sewer.” At the hearing, Finance Director Diane Schubach said the Township “has had a difficult time keeping up with the increases from the Somerset Raritan Valley Sewerage Authority, and it is essential for the utility to maintain financial stability.” The ordinance also drops a $63.50 quarterly meter administrative and inspection charge for metered properties. It was adopted on motion of Mr. Schworn, seconded by Mr. Owens (Aye: Schworn, Columbus, Owens, Beatrice, Young). The same night the Committee hired Mott MacDonald for a sewer collection system capacity evaluation at Meter Chamber 12B (Res. 2025-214). See the November 24, 2025 Committee meeting.

  4. Township government Resolved

    Committee adopts $1.2 million bond for emergency-services radios — link to this entry

    The Township Committee adopted Ordinance No. 2025-1502, appropriating $1,200,000 for communications equipment and authorizing $1,140,000 in bonds or notes, 4–0. Mayor Thomas Young said it would upgrade the radios for the Township's emergency services agencies.

    The ordinance includes a $60,000 down payment from previously adopted budgets and sets a 10-year period of usefulness. No one spoke at the public hearing. It was adopted on motion of Mr. Schworn, seconded by Mr. Owens; recorded vote 4–0 (Aye: Schworn, Owens, Beatrice, Young). Mayor Young said it “will allocate funding to upgrade the radios for our Emergency Services Agencies.” On Dec. 22, 2025, Township Administrator Gregory Bonin said the Administration would coordinate and facilitate the radio purchases for the fire and rescue companies, and on Jan. 12, 2026 the Committee authorized purchases of mobile radios and communications equipment from Motorola Solutions, Inc.

  5. Land use and development Resolved

    Planning Board lets the first Evans Way warehouse building go ahead as phase one — link to this entry

    The Planning Board approved S/K Stoney Brook Associates' amended application (2022-010P PFSP/PFSUB Amended) making the approved 30,000-square-foot building on Block 58.01, Lot 4 — 5,000 square feet of office and 25,000 of warehouse — the first phase of the 2023 Evans Way approval, with no change to the approved plan, and adopted Resolution PB 2025-022 the same night, 5–0. Block 58, Lot 36 stays in the Fourth Round housing plan.

    The applicant’s attorney, Glenn S. Pantel, said the amendment confirms a phasing line and changes none of the improvements approved in 2023. The applicant’s engineer, Mark Lescavage of Colliers Engineering & Design, said the building will have six loading bays, a 14-foot sound wall and 35 parking spaces, that part of the landscape buffer to the north will be built to screen the homes there, and that all outside agency approvals for Lot 4 are in place, including an Oct. 21 Somerset County Planning Board approval.

    Chairman Chabrak asked whether the project is still a housing project. Township Engineer Douglas Ball said Lot 4 is a stand-alone portion and the rest, Block 58, Lot 36, is still part of the Fourth Round affordable-housing plan; Board Planner Kendra Lelie said the stand-alone portion will be built first and the remainder will need site-plan approval and changes to the zoning ordinance. Mr. Pantel said the lot was under contract to be sold, with the closing that year and construction starting the next, and that the applicant remained committed to building the affordable housing.

    Lorie Kraynak of Breckenridge Drive asked who would occupy the building; Mr. Pantel said the buyer could not be named and the use would be the approved distribution/warehouse use. She said she had no objection. The Board approved the amendment and adopted the resolution on motion of Mr. Hambro, seconded by Councilwoman Columbus (Ayes: Chairman Chabrak, Councilwoman Columbus, Ms. Cook, Mr. Hambro, Mr. McLoughlin; absent: Councilman Owens, Mr. Verbeke, Ms. Donegan, Mr. Russoniello).

  6. Open space and environment Active Key moment

    Committee votes to move the 32-acre park parcel into open space — link to this entry

    The Township Committee voted to initiate the transfer of a 32-acre property in the northern section of town, between Routes 22 and 28, into the Township's Open Space system and to begin planning a public park, according to the Township's Oct. 14, 2025 release.

    The release says the property was acquired following the 2022 voter referendum and that the Municipal Open Space and Recreation Committee will lead the planning process and seek public input on features; early concepts include space for community events, walking paths, natural areas and facilities for concerts, festivals and civic gatherings. It quotes Mayor Thomas Young (“The original purpose of this purchase was to give Branchburg control over its future”) and Committeeman Dave Owens (“This property will move from preservation to purpose”), and says public workshop dates will be announced.

    At the November 10, 2025 Committee meeting, Mayor Young asked the Administrator to arrange a Parks and Open Space Committee meeting to set objectives for 2026 and to meet with RVCC on priorities for the properties in the north end of town. Ordinance 2026-1506, adopted Jan. 26, 2026, reconstituted that body as the Parks, Recreation and Open Space Committee.

  7. Roads and utilities Active Key moment

    Township to design sewer for the Miller Avenue "A-Green" area only, and rebuild the road — link to this entry

    After the Aug. 14, 2025 meeting with residents, the Township Administrator wrote that only the five-home A-Green area is a cost-effective sewer project, to be paid by an assessment estimated at $30,000 to $35,000 a home; that the Township will not build in the C-Blue area; and that Miller Avenue will be repaved at no cost to its residents.

    Gregory Bonin’s letter explains two ways residents pay for a sewer: an “assessment” on every property in an area when 70% or more of its residents want sewer, “in the range of $30,000 to $35,000 and usually paid over ten years, but that would be determined later”; or a “contract assessment” in which only the residents who sign repay the full cost and others pay a connection fee of about $8,000 if they later connect. Connection is not mandatory unless a septic system fails.

    It says that apart from “the small pocket of residents near Darcy Drive,” the rest of the area “voted not in favor,” and that the C-Blue project’s cost is “unreasonable for the public or Township to fund.” “Given the public vote and costs associated with the project options, the Township intends to move forward on the feasible project (A-Green project area),” with two adjacent homes possibly included, and “can now begin the design process.” The road work — repaving with driveway aprons and culvert restorations, with no widening, curbing, sidewalks or water main — is at no cost to Miller Avenue residents; no road improvements are proposed for Central Place or Station Road.

  8. Roads and utilities Pending

    Revised Miller Avenue sewer plan shows 31 homes, 15 interested — link to this entry

    The Township posted a map titled "Possible Sanitary Sewer Extension Miller Ave., Station Road and Central Place," revised August 2025 for Lots 2, 10.01, 11.08, 20 and 24. Its lettered sections count 31 homes, of which 15 are marked as wanting sewer.

    The map, drawn at 1 inch = 100 feet on an October 2024 base, marks Section A (5 of 5 homes want sewer), Section B (2 of 6), Section C (8 of 18) and Section D (none of 2), and distinguishes existing sewer, proposed sewer, a proposed force main and areas where owners are not interested in connecting. The Township’s Sept. 19, 2025 letter describes it as the revised plan “showing the sub-drainage areas and the current residents interested in public sewers.” The July 16, 2025 letter had counted 3 of 6 interested in B, 8 of 16 in C and 1 of 2 in D.

  9. Roads and utilities Pending

    Township prices four Miller Avenue sewer areas and calls an Aug. 14 meeting — link to this entry

    The Township Engineer's letter to Miller Avenue-area residents set out preliminary sewer-extension costs for four sub-drainage areas, from $140,400 to $1,275,525, with per-home shares from $36,720 to $159,440, and scheduled a meeting with residents for Aug. 14, 2025.

    Township Engineer Doug Ball wrote that past Township inquiries led it to review options to extend sanitary sewers to Miller Avenue, Central Place and a section of Station Road, where several sub-drainage areas could discharge into existing municipal sewers. The preliminary estimates: A-Green $183,600 (5 homes, all interested, $36,720 each); B-Orange $307,350 (6 homes, 3 interested; $51,225 each if all connect, $102,450 if only those interested); C-Blue $1,275,525 (16 homes, 8 interested; $79,720 or $159,440); D-Red $140,400 (2 homes, 1 interested; $70,200 or $140,400). The meeting was set for Aug. 14, 2025 at 7 p.m. in the Municipal Building courtroom.

  10. Affordable housing Resolved

    Township Committee endorses the plan at a special meeting (Resolution 2025-124) — link to this entry

    At a 9:05 a.m. special meeting, Resolution 2025-124 endorsed the adopted Housing Element and Fair Share Plan one day after the Planning Board adoption, 4–0: Mayor Thomas Young, Mr. James Schworn, Mrs. Anna Columbus and Mr. David Owens voted yes; Mr. Brendon Beatrice was absent.

    Mr. Schworn and Mrs. Columbus attended by video call, and the minutes record about one member of the public, who did not comment. Mr. Owens reported on the Planning Board hearing the night before, and Mayor Young said the plan is a required element of the Township’s affordable-housing obligation, due June 30. Township Attorney William Willard said that once the Committee endorsed the plan the Township would begin implementation and adopt the ordinances, all of which must be in effect by March 2026.

    The resolution recites the Superior Court order establishing the 0 present-need / 255 prospective-need obligation as entered April 8, 2025; the Planning Board’s June 24 resolution dates the same order to April 18, 2025. The resolution also directs that a copy be sent to the Office of Planning Advocacy and the Somerset County Planning Board within 30 days.

  11. Affordable housing Resolved Key moment

    Planning Board adopts the Fourth Round Housing Element and Fair Share Plan — link to this entry

    After a public hearing at which Board Planner Kendra Lelie presented the plan and no member of the public commented, the Planning Board adopted the Housing Element and Fair Share Plan by Resolution PB 2025-018: 208 units plus 63.5 bonus credits — 271.5 credits — against a 255-unit obligation plus seven carried Third Round units. The vote was seven ayes, two absent.

    The roll call, from the resolution’s memorialization table: Douglas Chabrak, Vicki Cook, Anna Columbus, David Owens, Alan Verbeke, Charles McLoughlin and Daniel Russoniello voted aye; Larry Hambro and Maria Donegan were absent; no nay or ineligible marks appear. Vicki Cook made the motion and Alan Verbeke seconded it. The minutes record that Chairman Chabrak opened the hearing to public comments and questions and closed it with none. Ms. Lelie said Evans Way, which “previously faced opposition due to proposed industrial warehouses,” would become 400 homes — 80 affordable, 240 market-rate apartments and 80 market-rate townhomes — after the Township asked KRE for townhomes and a lower density, and that KRE, which also owns Whiton Hills, had agreed to extend its 74 affordable units. Mr. Owens said the question was not whether to accept a plan but how many units it must include, and that housing development is preferable to warehouse development, a view the minutes say other Board members shared.

    The plan’s four mechanisms, all listed as proposed in its summary table: extensions of affordability controls on 74 affordable units at Whiton Hills, a 400-unit inclusionary project at Evans Way/KRE with 80 affordable units, a 250-unit inclusionary project at Vollers/Premier with 50 affordable credits, and four supportive/special-needs bedrooms at 147 Stony Brook Road. The plan was filed with the court in docket SOM-L-142-25 on June 25, 2025, the same day the Township Committee endorsed it by Resolution 2025-124.

  12. Roads and utilities Pending

    Mayor's letter and Township FAQ state Branchburg's position on Fox Hollow — link to this entry

    The Mayor's Office issued a letter to Fox Hollow residents and the Township posted a frequently-asked-questions document: the developer still needs approvals from NJDEP, SRVSA and Bridgewater; Branchburg must consent and cooperate but cannot guarantee outcomes or override other agencies.

    The letter states that SRVSA, which serves seven towns, is nearing capacity, faces PFAS and microplastic treatment mandates with modernization costs that could exceed $100–$200 million, and is uncertain whether its site can support expansion. Both documents say the Township would oppose a septic or small-scale wastewater treatment facility on the Branchburg portion serving development in another municipality, and the letter cites the portion’s zoning, steep slopes and wetlands. Both refer to a developer-hosted community meeting without an attendance or speaker count. These are the Township’s dated statements. The Township’s Fox Hollow news page points to the letter, the FAQ and the agreements in its Document Center.

  13. Taxes and budget Pending

    Township announces 2025 budget adoption and a 22nd straight AAA year — link to this entry

    A Township release announced adoption of the 2025 budget and said Branchburg maintained a Standard & Poor's AAA bond rating "for the 22nd consecutive year," plus an SP-1+ short-term rating. The release anticipated an overall property tax increase of 1% to 3% for most residents.

    The release is the Township’s own announcement; the S&P report linked by an earlier Township page is dated September 2024. The 2026 user-friendly budget also reports the AAA rating but leaves its “Year of Last Rating” field blank.

  14. Roads and utilities Pending

    Picket Place bridge local officials briefed on preliminary engineering — link to this entry

    The project's meetings page lists a virtual Local Officials Briefing No. 1 on April 17, 2025 at 10:00 a.m., to review the project and the Local Concept Development study findings and present upcoming tasks in the preliminary engineering phase.

    The same page lists a Community Stakeholder Meeting (Summer 2025), Local Officials Briefing No. 2 (Fall 2025) and a Public Information Meeting (Fall 2025), each with time and location “TBD.” The site does not confirm whether those anticipated meetings were held.

  15. Affordable housing Resolved Key moment

    Settlement with Fair Share Housing Center sets the obligation at 255 units — link to this entry

    Resolution 2025-70, adopted March 24, 2025, authorized a mediation agreement with Fair Share Housing Center settling Branchburg's Fourth Round obligation at 0 present-need and 255 prospective-need units. The New Jersey Builders Association wrote that it had no intention of objecting to or appealing the settlement. Mr. Schworn, Mrs. Columbus, Mr. Owens and Mayor Thomas Young voted yes; Mr. Beatrice was absent.

    The research record dates the mediation between March 20 and 24, 2025. FSHC and the New Jersey Builders Association had objected to the Township’s January calculation of 247 prospective-need units; the resolution recites the NJBA letter stating it had no intention of objecting to or appealing the settlement.

    A Superior Court order then established the 255-unit obligation. The township’s records give two dates for that order:

    RecordDate it gives for the order
    Township Committee Resolution 2025-124 (June 25, 2025); Township’s March 13, 2026 court filingApril 8, 2025
    Planning Board Resolution PB 2025-018 (June 24, 2025)April 18, 2025

    The order is known from these recitals. The 255-unit figure carried through the adopted plan and the April 15, 2026 final compliance order.

  16. Affordable housing Resolved

    Township Committee adopts a Fourth Round obligation of 247 units — link to this entry

    Resolution 2025-45 committed Branchburg to 0 present-need (rehabilitation) units and 247 prospective-need units for 2025–2035. The state's October 18, 2024 advisory estimate had been 297; two later Township records recite the recalculation as 248. The Township filed the action in docket SOM-L-142-25 the next day.

    The Township filed its declaratory-judgment action and this resolution with the Superior Court on January 28, 2025. Fair Share Housing Center and the New Jersey Builders Association objected to the Township’s calculation, and the obligation was settled at 255 units in March 2025.

    Two later township records recite the Township’s recalculation as 248 rather than the 247 in this resolution’s operative text: the Planning Board’s June 24, 2025 resolution and the adopted Housing Element and Fair Share Plan. The records do not reconcile the difference.

  17. Taxes and budget Pending

    2024 Annual Debt Statement filed: net debt $35,650,364.62 — link to this entry

    The Township filed its 2024 Annual Debt Statement, prepared Jan. 23 by CFO Diane Schubach, reporting gross debt of $56,405,000, deductions of $20,754,635.38 and net debt of $35,650,364.62 — 0.812% of the $4,387,921,011 equalized valuation basis.

    The deductions include $11,910,000 of local-school debt and $2,550,000 of self-liquidating sewer-system debt, both fully deducted. The statement lists $2,550,000 of sewer serial bonds as authorized but not issued, with 2024 utility cash receipts of $7,366,673 and operating and maintenance costs of $4,515,939.43.

2024 5 entries

  1. Roads and utilities Pending

    Picket Place bridge preliminary engineering begins — link to this entry

    The project website lists Local Preliminary Engineering as the current phase, dated "Fall 2024 to Summer 2026," during which the project team is to refine the preferred alternative and secure approval of the environmental document under NEPA requirements.

    The phase’s listed tasks include an approved cultural resources report, right-of-way report, preliminary plans, a public information meeting, the environmental document and the preliminary engineering report. Final design and right-of-way acquisition carry an anticipated start in 2028, and construction an anticipated start listed as design-dependent.

  2. Open space and environment Pending

    SPPP annual review records the stormwater program — link to this entry

    The Township's Stormwater Pollution Prevention Plan, titled 2023, shows an annual-review date of Sept. 10, 2024 that "updated ordinances and personnel": NJPDES permit NJG0148539, coordinator Doug Ball, P.E., 89 municipal sweeping miles, 10 industrial sweeping miles and a 2018 outfall map.

    The plan’s inventory form lists most MS4 infrastructure counts — outfalls, groundwater discharge points, interconnections, inlets, manholes, conveyance length and facilities — as “TBD”, with pump stations at 0 and maintenance yards at 2, on a form that says the totals were due Jan. 1, 2026. Its Watershed Improvement Plan form also reads “TBD.” These are the plan’s entries at the 2024 review, the version posted on the Township website.

  3. Open space and environment Pending

    Stormwater Control Ordinance 2024-1477 adopted — link to this entry

    The Township Committee adopted Ordinance 2024-1477, rewriting the Land Development Ordinance's stormwater rules for major developments to match NJDEP's July 2023 amendments, with green infrastructure required for recharge, quality and quantity standards.

    The records give two adoption dates: the SPPP’s ordinance table says the ordinance was adopted Aug. 25, 2024, and the ordinance scan’s closing page reads Aug. 26, 2024. The scan’s vote pages show a first reading on July 22, 2024 with five yes and a final reading of four yes and one absent, as visually checked against the archived pages.

    The ordinance responds to NJDEP amendments to N.J.A.C. 7:8-1.1 et seq. adopted July 17, 2023. It applies to nonresidential major developments, non-preempted aspects of residential major developments and Township-undertaken major developments, with transition rules for applications filed before July 22, 2024. It becomes effective upon adoption, publication and approval by the Somerset County Planning Board, or within 60 days of county receipt without action.

  4. Roads and utilities Pending

    Township plan set prepared for Holland Brook Road improvements — link to this entry

    The Township's engineering plan set "Improvements to Holland Brook Road between Structure C0704 and US Highway Route 202," dated May 20, 2024 and prepared by Bright View Engineering, covers construction, grading and drainage, signing and striping, and traffic-signal work at the Route 202 intersection.

    The five-sheet set carries the Township Engineer’s name (Douglas Ball, P.E.) and a 2024 committee roster on its title sheet: Mayor Anna Columbus; Deputy Mayor Thomas Young; Committeepersons James Schworn, Brendon Beatrice and David Owens. The legend includes traffic-signal mast arms, signal heads and pedestrian signals. The title sheet also carries an “Approved for Construction By:” line. On March 9, 2026, Township Administrator Gregory Bonin told the Township Committee that the proposed traffic signal at Route 202 and Holland Brook Road should be in place within the next year.

  5. Open space and environment Pending

    Township issues $19.33 million in notes under property-acquisition Ordinance 2024-1464 — link to this entry

    The 2025 Township audit lists Ordinance 2024-1464, "Acquisition of Property," financed with $19,330,000 in bond anticipation notes first issued Apr. 25, 2024, and counts $19,330,000 of bonds and notes at the end of 2025 as to be paid by the Open Space Trust Fund.

    The audit’s note schedule shows the 2024-1464 notes renewed on Apr. 23, 2025 at 3.50%, due Apr. 22, 2026, with $19,330,000 outstanding at Dec. 31, 2025. Its summary of municipal debt deducts “Bonds and Notes to be Paid by Open Space Trust Fund” of $19,330,000 for 2025, against $5,700,000 for each of 2024 and 2023. The audit identifies the ordinance only as “Acquisition of Property”; it does not name the parcels.

2023 4 entries

  1. Open space and environment Pending

    Township issues notes under property-acquisition Ordinances 2023-1455 and 2023-1457 — link to this entry

    The 2025 Township audit lists two 2023 "Acquisition of Property" ordinances, 2023-1455 and 2023-1457, financed with bond anticipation notes first issued Oct. 11, 2023: $5,000,000 under 2023-1455 (retired in 2025) and $7,600,000 under 2023-1457 (still outstanding at the end of 2025).

    The audit’s note schedule shows the 2023-1457 notes renewed on Oct. 9, 2024 and again on Oct. 4, 2025, due Oct. 6, 2026 at 4.25%, and the 2023-1455 note, $5,000,000 at Dec. 31, 2024, retired during 2025 with no renewal. A further $95,000 was authorized but not issued under 2023-1457 at Dec. 31, 2025. The audit identifies both ordinances only as “Acquisition of Property”; it does not name the parcels.

    In remarks printed in the Jan. 5, 2026 minutes, Mayor James Schworn said the Township “purchased two properties on Route 28,” the Advance property, which he said is being converted to open space, and the Pizzo property.

  2. Roads and utilities Active

    Resolution 2023-216 extends the Fox Hollow MOU deadlines to 2026, 2027 and 2030 — link to this entry

    The Township Committee adopted Resolution 2023-216, authorizing an extension of the Fox Hollow sewer-service MOU: permits and approvals for the sewer improvements by Dec. 31, 2026, approvals for the Readington development by Dec. 31, 2027, and completed, connected improvements by Dec. 31, 2030.

    The extension replaces the MOU’s original deadlines of Sept. 30, 2022, Mar. 30, 2023 and Sept. 30, 2025. The dates may be extended again only in writing by mutual agreement. The roll call, as visually checked against the resolution’s scan: Young, Schworn, Beatrice and Owens yes; Columbus absent. The executed extension’s handwritten date is not legible in the scan.

  3. Roads and utilities Pending

    Somerset County seeks proposals for Picket Place bridge preliminary engineering — link to this entry

    Somerset County released RFP #CY-COM-9003-23 for the Local Preliminary Engineering phase of the replacement of County Bridge No. C0609, which carries Picket Place (CR 567) over the South Branch of the Raritan River between Branchburg and Hillsborough.

    The county’s project page says the Local Concept Development phase was completed and the project approved to advance to Local Preliminary Engineering, in which detailed engineering and technical environmental studies are to obtain Federal Highway Administration approval of the environmental document, qualifying the project for federal Final Design and Construction funds. The project runs through the federally funded Local Capital Project Delivery program administered by NJDOT Local Aid District 3, in coordination with NJTPA.

  4. Land use and development Resolved

    Planning Board approves the Evans Way warehouse site plan — link to this entry

    The Planning Board adopted a memorializing resolution approving application 2022-010P—PFSP/PFSUB, S/K Stoney Brook Associates' preliminary/final major subdivision and site plan for the warehouse project. In October 2025 the Board let the 30,000-square-foot building on Block 58.01, Lot 4 go ahead first as phase one; the rest of the site was rezoned for housing in March 2026.

    The date comes from the recitals of Ordinance 2026-1508; the Planning Board’s October 28, 2025 minutes refer to the same resolution as “approved by the Planning Board on July 27, 2023.” The June 2025 Housing Element and Fair Share Plan describes the Evans Way site as vacant.

    On October 28, 2025 the Board approved an amendment phasing this approval (Resolution PB 2025-022, 5–0): the approved 30,000-square-foot building on Block 58.01, Lot 4 — 5,000 square feet of office and 25,000 of warehouse — became phase one, with no change to the 2023 plan. Ordinance 2026-1508 later replaced the warehouse plan for Block 58, Lot 36 with housing.

2022 4 entries

  1. Open space and environment Pending Key moment

    Voters approve the Route 22/28 open-space acquisition question — link to this entry

    Branchburg voters approved the public question on expending public funds to acquire land in the Route 22/28 corridor to prevent large warehouse development, 2,894 yes to 2,045 no in the Somerset County Clerk's final certified results.

    The question asked: “Should the Township of Branchburg expend public funds to acquire land within the Route 22/28 corridor for the purpose of preventing large commercial warehouse/distribution type facility development in favor of development more beneficial to the community and its residents?”

    The County Clerk’s final certified results, last updated Nov. 23, 2022, list the Branchburg Municipal Public Question at 2,894 yes (58.59%) and 2,045 no (41.41%). Branchburg had 12,368 registered voters and 6,681 ballots cast in the election.

  2. Open space and environment Pending

    Mayor Schworn's letter explains the Route 22/28 land-acquisition question — link to this entry

    Mayor James Schworn's letter to residents reproduced the November ballot question on acquiring Route 22/28 corridor land to prevent large warehouse development, called the referendum non-binding, and estimated the properties' market value at $25 million and a potential tax increase at about $220 per household.

    The letter says a yes vote would give the Township the option, not an obligation, to acquire the properties, that the owners were under no obligation to sell in whole or in part, and that any purchase would be subject to mandatory public readings and Township Committee approval. It also says two large parcels on the north side of town along the Route 28 corridor could support a 300,000+ square foot manufacturing facility with warehousing under the current zoning.

  3. Land use and development Resolved

    Evans Way warehouse redevelopment plan adopted — link to this entry

    Ordinance 2022-1424 adopted the Evans Way Redevelopment Plan and established an Evans Way Redevelopment Plan Zone. A May 10, 2022 redevelopment agreement with property owner S/K Stoney Brook Associates provided for three warehouse/distribution buildings totaling approximately 300,300 square feet and a 2.26-acre land donation to the Township for municipal purposes.

    The same ordinance’s recitals describe the August 19, 2022 plans for application 2022-010P—PFSP/PFSUB: a 200,750-square-foot building on proposed Lot 36, a 66,150-square-foot building on proposed Lot 36.02 and a 30,000-square-foot building on Block 58.01, Lot 4, with proposed Lot 36.01 to be donated to the Township. The recitals give the agreement total as approximately 300,300 square feet across three buildings and the application’s proposed building areas as 200,750, 66,150 and 30,000 square feet; the record excerpt does not explain the difference. The agreement’s terms do not establish that the donation occurred.

  4. Land use and development Resolved

    Evans Way designated a non-condemnation redevelopment area — link to this entry

    Township Committee Resolution 2022-60 designated the study area a non-condemnation redevelopment area. The Planning Board had recommended the designation by Resolution 2022-008 after a January 25, 2022 public hearing at which the planning consultant testified and the public could ask questions and raise objections.

    The redevelopment study report was dated January 4, 2022. The ordinance’s recitals do not give a count of public speakers at the January 25, 2022 Planning Board hearing; they state that testimony was received from the planning consultant and that members of the public were given the opportunity to ask questions and raise objections.

2021 1 entries

  1. Land use and development Resolved

    Township Committee orders a preliminary redevelopment investigation of the Evans Way area — link to this entry

    Resolution 2021-237 directed a preliminary redevelopment investigation of Block 58, Lot 36, Block 58.01, Lot 4 and portions of the Evans Way right-of-way — the properties that became the Evans Way non-condemnation redevelopment area.

    The recitals of Ordinance 2026-1508, filed with the court in March 2026, describe this 2021 step: the investigation report was dated January 4, 2022, and the Planning Board held a noticed public hearing on it on January 25, 2022, before recommending designation.

2020 2 entries

  1. Roads and utilities Active Key moment

    Resolution 2020-177 approves the Fox Hollow sewer-service MOU — link to this entry

    The Township Committee adopted Resolution 2020-177, authorizing a Sewer Service MOU with FH Golf Partners, LLC for a 240-unit Readington proposal — 192 age-restricted and 48 affordable units — capped at 60,000 gallons per day, with the developer funding the sewer improvements.

    The MOU recites a Township sewer-conveyance study, funded by an escrow agreement dated Dec. 28, 2018, that found insufficient present conveyance capacity, and says sufficient capacity could be created through improvements at the Brandywine Pump Station and the Branchburg conveyance system. FH Golf Partners must secure approvals and construct the improvements at its sole cost, including sewer lines to Manhole 1873 on Block 5.11, Lot 2, with approvals required from SRVSA, Branchburg, Bridgewater, Somerset County and NJDEP, including the Water Quality Management Plan amendment. The MOU provides for donation of the Branchburg portion — valued at $2,300,000 for donation purposes — under listed triggers, and requires quarterly project updates. The attached Mott MacDonald report of July 29, 2020 measured the Brandywine Pump Station at 325 gallons per minute, put the future design flow at 361 gallons per minute, and estimated $615,000 for the pump-station upgrades.

    The resolution’s OCR vote table does not reliably map checkmarks to the roll-call columns, so the member-by-member vote on Resolution 2020-177 is not stated here.

  2. Roads and utilities Pending

    Picket Place bridge concept work completes — link to this entry

    The project website's timeline marks Local Concept Development completed in summer 2020; its news page says the study graduated from Local Concept Development to Local Preliminary Engineering on July 1, 2020.

    The concept-development stage’s listed tasks included the purpose-and-need statement, data collection and environmental screening, selection of the preliminary preferred alternative, the concept development report, NEPA classification and initial public outreach.

2019 2 entries

  1. Roads and utilities Pending

    Second Picket Place bridge public meeting presents conceptual alternatives — link to this entry

    The project's news archive lists Public Information Meeting No. 2 at the Hillsborough Township Municipal Complex, 5–8 p.m., to present conceptual improvement alternatives — listed as the Preliminary Preferred Alternative — and collect public comments through print forms.

    The archive does not supply attendance or comment totals. The bridge carries County Route 567 over the South Branch Raritan River between Branchburg and Hillsborough; the first 2019 meeting was held in Branchburg and this one in Hillsborough.

  2. Roads and utilities Pending

    First Picket Place bridge public meeting, at the Branchburg Municipal Building — link to this entry

    The project's news archive lists Public Information Meeting No. 1 at the Branchburg Municipal Building, 5–8 p.m., to obtain input on the purpose-and-need statement, with print and web comment forms. The listing is an announcement, not proof of attendance or comments received.

    The open-house-style meeting was billed as a chance to learn about the project, ask questions of team representatives, and view project history, status, studies and concepts on display boards. The archive does not supply attendance or comment totals.

1980 1 entries

  1. Roads and utilities Pending Key moment

    Branchburg settles the Fox Hollow litigation with sewer access and land restrictions — link to this entry

    Branchburg and Fox Hollow Enterprises, Inc. executed a Stipulation of Settlement in two pending Superior Court actions, dockets L-55046-77 and L-48938-78: sewer access for a Readington development of up to 200 units, single-family one-acre zoning on the Branchburg portion, and preservation of that portion once sewer service is used.

    The settlement defines the Branchburg portion as Block 5, Lot 2 and the Readington portion as Block 15, Lot 28, and caps the “Readington Development” at 200 units with continued golf use. It provides sewer access first to the Brandywine pumping station, or to the Township’s Fox Hollow sewerage plant if an agency denies that access, with the developer paying connection and expansion costs. Upon the first use of sewer access, the Branchburg parcel is restricted to golf-course use or an open natural preserve, with development and use rights conveyed to the Township except continued golf use. Townhouses and cluster development are excluded from the Branchburg portion.

    The settlement recites that the actions would be dismissed with prejudice by consent order; LocalWhy has not reviewed the order itself. Counsel’s Apr. 22, 1980 letter says Ordinance 80-372, which included the settlement’s zoning terms, was adopted at the previous evening’s meeting.