Roads and utilities
Municipal roads and traffic
Branchburg's 2026 budget schedules $2,540,000 of road improvements within a $13,040,000 six-year capital line. In 2026 the Township bought resurfacing materials from Schifano Construction, paid it $996,214.10 for road resurfacing on two bill lists, adopted $1,348,000 in Public Works equipment ordinances, and is working with Norfolk Southern toward a permanent quiet zone at the Lehigh Road rail crossing.
What happens next
The Lehigh Road crossing plans await Norfolk Southern's approval, and residents have noted the temporary quiet zone runs to spring 2027. The Township has bid snow plowing services for the winter. Committee meetings are the second and fourth Mondays, 7 p.m., Municipal Building courtroom.
Branchburg maintains municipal roads through budgeted appropriations, a capital improvement program and Department of Public Works operations; the Township Committee’s minutes record the purchases, payments and ordinances behind them.
The capital plan. The 2026 adopted budget’s six-year capital program lists a road-improvements line totaling $13,040,000 for 2026–2031: $2,540,000 in 2026, $2,500,000 in 2027, and $2,000,000 in each of 2028 through 2031. The same program lists $2,200,000 for DPW equipment, $950,000 of it in 2026. The adopted budget’s current-year road-improvement capital line reads $1,300,000 — a different schedule from the capital program’s $2,540,000, which the budget does not reconcile.
Resurfacing in 2026. On May 11 the Committee authorized the purchase of road resurfacing materials from Schifano Construction Corporation (Resolution No. 2026-96, consent, 4–0). The bill lists the Committee approved include $562,847.36 (June 22) and $433,366.74 (Aug. 10) to Schifano Construction for road resurfacing. On Sept. 14 Mayor James Schworn said the Township had received positive feedback on Schifano’s paving in the Fox Hollow development.
Public Works equipment. On May 26 the Committee adopted Ordinance No. 2026-1514, 4–0, appropriating $1,018,000 from the Capital Improvement Fund for a street sweeper, a loader, a double drum asphalt roller and a mini asphalt track paver; the purchases followed on June 22 and July 13. On Sept. 14 it adopted Ordinance No. 2026-1517, 5–0, appropriating $330,000 from the capital fund balance for equipment including a replacement dump truck, after a truck was destroyed by fire.
The Lehigh Road rail crossing. Residents, several from Briar Way, have asked at 2026 meetings about the temporary quiet zone at the Lehigh Road crossing. Township Administrator Gregory Bonin said on April 27 that it is a two-year permit the Township would reapply for if the crossing is not yet improved, and on May 11 that closing the crossing would add about six minutes to emergency response. Norfolk Southern’s maintenance work at the crossing, which overlapped the Township’s planned upgrades, was complete by July 27; on Sept. 14 Mr. Bonin said the Township’s updated plans were with Norfolk Southern, whose approval the Township needs, and that the Township hopes construction can be done this year or early next year.
2025 spending. The 2025 audit reports road repair and maintenance appropriations of $1,746,000 in wages and $644,500 in other expenses, with $1,548,531.60 and $475,984.51 paid, snow removal at $235,000 budgeted and $211,095.79 paid, and a $1,000,000 road-improvement reserve with $997,762.50 expended.
Other matters. On Feb. 9 Mr. Bonin said NJDOT is aware of long delays at the Old York Road and Route 22 signal; on Sept. 14 the Committee agreed by consensus to have the Township Attorney draft an ordinance vacating a landlocked paper street at 2228 South Branch Road; and on Oct. 12 it authorized bids for snow plowing services (Resolution No. 2026-173, 3–0). Route 202 is a state highway (Route 202 safety) and the Picket Place bridge is a Somerset County project (Picket Place bridge).
Timeline
- Milestone 2026 budget schedules $2,540,000 of road improvementsThe 2026 budget, which the Township Committee introduced on March 23, 2026 and adopted on April 27, 2026, 5–0, schedules $2,540,000 for road improvements in 2026 within a $13,040,000 six-year capital line, and $950,000 in 2026 for DPW equipment within a $2,200,000 line.
- Resolved Committee adopts $1.5 million in capital ordinances for police, fire and Public WorksThe Township Committee adopted four capital ordinances, each 4–0 with no public comment and paid from existing capital funds: No. 2026-1512 ($100,000, facility improvements), 2026-1513 ($240,000, police vehicles and equipment), 2026-1514 ($1,018,000, Public Works equipment) and 2026-1515 ($150,000, volunteer fire-company equipment).
- Pending Lehigh Road crossing: Norfolk Southern work done, Township plans submittedTownship Administrator Gregory Bonin said Norfolk Southern's maintenance work at the Lehigh Road rail crossing was complete and the Township's updated construction plans for a permanent quiet zone had been submitted to Norfolk Southern for approval.
- Milestone 2025 audit reports road-repair and snow-removal spendingThe 2025 Township audit, dated Aug. 3, 2026, reports road repair and maintenance appropriations of $1,746,000 in wages and $644,500 in other expenses, with $1,548,531.60 and $475,984.51 paid/charged, and a $1,000,000 road-improvement reserve of which $997,762.50 was expended.
Explainers
Documents
Meetings
- Township Committee — September 14, 2026
- Township Committee — August 10, 2026
- Township Committee — July 27, 2026
- Township Committee — June 22, 2026
- Township Committee — June 8, 2026
- Township Committee — May 26, 2026
- Township Committee — May 11, 2026
- Township Committee — April 27, 2026
- Township Committee — February 23, 2026
- Township Committee — January 26, 2026
Sources for this overview
- Township Committee minutes, May 11, 2026 (Documents-On-Demand, via the Agendas/Minutes page)
- Township Committee minutes, May 26, 2026 (Documents-On-Demand, via the Agendas/Minutes page)
- Township Committee minutes, June 22, 2026 (Documents-On-Demand, via the Agendas/Minutes page)
- Township Committee minutes, August 10, 2026 (Documents-On-Demand, via the Agendas/Minutes page)
- Township Committee minutes, September 14, 2026 (Documents-On-Demand, via the Agendas/Minutes page)
- Township Committee minutes, October 12, 2026 (Documents-On-Demand, via the Agendas/Minutes page)
- 2026 Adopted Budget, capital budget and 2026–2031 capital improvement program
- 2025 Township Audit, road repair, snow removal and reserve expenditure schedules
- Stormwater Pollution Prevention Plan (2023 title, annual review Sept. 10, 2024), sweeping program
- Public Works Department